answersLogoWhite

0


Best Answer

my balls

User Avatar

Wiki User

12y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How long should allow the prime coat to fully cure?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

You recently painted a bathroom using Benjamin Moore Regal paint in a pearl finish you noticed that there where streaks after the shower and the paint is sticky you have been told you stressed the pai?

The paint was not fully cured when you used the shower. Now it will not dry until you stop using the shower for an extended time. Your option is to prime with a water based primer, allow to dry fully, coat with a eggshell or better coat, allow to dry fully, then recoat. Then allow to dry fully prior to using the shower.


Should you put a prime coat on new drywall before you add blown acoustical?

No, the prime coat can go on anytime.


Can you mix your clear coat with the paint and how much clear coat should i use?

Mixing clearcoat with paint, will ruin the paint.For enamel paints, make sure you use an enamel clearcoat. You should allow the paint to fully cure (at least a week) before attempting to apply the clearcoat. Never use a lacquer based clearcoat on an enamel based paint. It will ruin it.For lacquer based paint, you should only use a lacquer based clearcoat. The paint should be dry, but does not have to be fully cured, since the lacquer will wet the coat of paint below it anyway.


What is the major importance of prime coat on base course?

The major importance of prime coat on base course should be to produce an appropriate surface for a stronger bond between the asphalt binder course and the base course. Apart from this, the prime coat also discourages the intrusion of surface moisture into the underlying layers.


What is the difference between tack coat and prime coat?

There is a substantial amount of misinformation concerning the function and proper use of prime. Prime is not glue-causing the base to adhere to the pavement is not its purpose. Prime's purpose is to protect the base from rain and light traffic, when the paving will be delayed.A prime coat is an application of an asphalt cutback or emulsified asphalt to a prepared base. The base can be either a sub grade or a base rock. Prime functions as a protector from rain for both types of bases. A primecoat should not be confused with a tack coat. Tack is an a adhesive for gluing two asphalt layers together.


How long to wait to add second coat of clear?

You should generally wait a full 24 hours before adding a second coat of clear to a vehicle. This allows it to fully dry and cure for the best results.


What is the application rate for a prime coat?

.1 to .25


Is there a need to seal wood before using spar varnish?

No. The spar varnish acts as the sealer. Apply a thin coat and allow it to dry. Apply a second coat and allow it to dry. These two coats should have sealed the pores of the wood. Apply the third coat slightly thicker, so you get a nice even "wet look" to the wood.


What is the coat of endospores composed of?

The endospore coat is composed of enzymes which are used in germination. The coat does not allow large toxic molecules to penetrate it.


What does entrobed mean?

enrobed? to coat or fully cover an item with a dissimilar substance


How is a prime coat applied?

Exactly like a top coat of paint: with a brush, a roller or a sprayer, depending on the surface being coated.


Does intumescent paints require any special type of topcoat?

In exposed and semi-exposed interior environments, the applied intumescent paint should be coated with a compatible finish coat, in order to give the desired colour and seal the coating. The topcoat system must be suitable for the environment in which it is to be used and should be a good quality, long oil alkyd, silicone, acrylic latex or polyurethane type. All topcoats should be applied in accordance with the topcoat manufacturer's recommendations. Ensure that the coating is thoroughly dry before application of top coat. Typically, allow a minimum of 7 days for the intumescent coating to fully cure before application of any top coat system. The intumescent paint manufacturer should be contacted to ensure compatibility of the top coat system.