Based on a 50 c.y. foundation with a minimal 2500psi concrete, manual batching would require approx 214.28 bags of type-II/V. Impossible to be exact not knowing the end result vol. Concrete is batched by weight to achieve a desired volume of material.
2000 bags
The cost to build a four bedroom house depends on the area where you live and the material you use. On average, a four bedroom house will cost between $150,000 and $200,000.
With cement or bricks and then since we have all the technoligy to build them.
no
Portland Cement Company and Nebraska Cement Company (both formerly part of the Ideal Cement Company.)
cost to a two bedroom in west drayton
With cement or bricks and then since we have all the technoligy to build them.
for build home
'fesses'
It wasn't rock, but cement. The Romans invented cement and used it on everything.
cement, rocks and some white marble, cement, wood and stone
15