What is CRS masonry?

Stone masonry may be broadly classified into the following two types:Rubble MasonryAshlar Masonry Rubble Masonry:The stone masonry in which either undressed or roughly dressed stone are laid in a suitable mortar is called rubble masonry. In this masonry the joints are not of uniform thickness.Rubble masonry is further sub-divided into the following three types:Random rubble masonrySquared rubble masonryDry rubble masonryRandom rubble masonry: The rubble masonry in which either undressed or hammer dressed stones are used is called random rubble masonry. Further random rubble masonry is also divided into the following three types:Un coursed random rubble masonry: The random rubble masonry in which stones are laid without forming courses is known as un coursed random rubble masonry. This is the roughest and cheapest type of masonry and is of varying appearance. The stones used in this masonry are of different sizes and shapes. before lying, all projecting corners of stones are slightly knocked off. Vertical joints are not plumbed, joints are filled and flushed. Large stones are used at corners and at jambs to increase their strength. Once "through stone" is used for every square meter of the face area for joining faces and backing.Suitability: Used for construction of walls of low height in case of ordinary buildings.Coursed random rubble masonry: The random rubble masonry in which stones are laid in layers of equal height is called random rubble masonry. In this masonry, the stones are laid in somewhat level courses. Headers of one coursed height are placed at certain intervals. The stones are hammer dressed. Suitability: Used for construction of residential buildings, go downs, boundary walls etc.Squared rubble masonry: The rubble masonry in which the face stones are squared on all joints and beds by hammer dressing or chisel dressing before their actual laying, is called squared rubble masonry. There are two types of squared rubble masonry.Coursed Square rubble masonry: The square rubble masonry in which chisel dressed stones laid in courses is called coarse square rubble masonry. This is a superior variety of rubble masonry. It consists of stones, which are squared on all joints and laid in courses. The stones are to be laid in courses of equal layers. and the joints should also be uniform. Suitability: Used for construction of public buildings, hospitals, schools, markets, modern residential buildings etc and in hilly areas where good quality of stone is easily available.Un coursed square rubble masonry: The squared rubble in masonry which hammer dressed stones are laid without making courses is called un coursed square rubble masonry. It consists of stones which are squared on all joints and beds by hammer dressing. All the stones to be laid are of different sizes. Suitability: Used for construction of ordinary buildings in hilly areas where a good variety of stones are cheaply available.Dry rubble masonry: The rubble masonry in which stones are laid without using any mortar is called dry rubble masonry or sometimes shortly as "dry stones". It is an ordinary masonry and is recommended for constructing walls of height not more than 6m. In case the height is more, three adjacent courses are laid in squared rubble masonry mortar at 3m intervals.


How much cubic meter cement mortar use for 1 cubic meter block retaining wall work?

32


For 1metet cube of brick work how much cement is required?

For 1 meter cube of brick work, you would need approximately 13 bags of cement.


How many tons of fly ash are equal to one cubic meter of fly ash?

1.2 metric tons equals 1 cubic meter of Fly ash (one of the residues of coal combustion).


Cement required for m20?

For M20 grade concrete, the mix proportion is 1:1.5:3 (cement:sand:coarse aggregates). If we consider a volume of 1 cubic meter, approximately 320 kg of cement would be needed.

Related questions

What is the Method of work for Concrete Masonry Block construction?

what is the weight of concrete block work per cubic meter.


What is the weight of 1 cubic meter of stone?

It depends on the specific weight of the special sort of stones. 1 cubic meter of water weighs 1 tonne.


How many bags required for 1cubic meter work of random rubble masonry?

85 kgs of cement is used for 1 cubicmetre of RR masonry work


How many cubic meter are there in one truck elf?

one elf can load 1.2 cubic meter http://andrewcrvz.blogspot.com/


How much water is REQUIRED in one cubic meter of concrete?

12L


What is the weight of one cube of masonry random rubble?

One cubic meter of rough (paddy) rice weighs about 577 kilograms or 1,273 pounds.


How much percentage of steel required in one meter cubic of conceret?

13%


How much bags of cement required for 1 cubic meter brickwork?

3


What is CRS masonry?

Stone masonry may be broadly classified into the following two types:Rubble MasonryAshlar Masonry Rubble Masonry:The stone masonry in which either undressed or roughly dressed stone are laid in a suitable mortar is called rubble masonry. In this masonry the joints are not of uniform thickness.Rubble masonry is further sub-divided into the following three types:Random rubble masonrySquared rubble masonryDry rubble masonryRandom rubble masonry: The rubble masonry in which either undressed or hammer dressed stones are used is called random rubble masonry. Further random rubble masonry is also divided into the following three types:Un coursed random rubble masonry: The random rubble masonry in which stones are laid without forming courses is known as un coursed random rubble masonry. This is the roughest and cheapest type of masonry and is of varying appearance. The stones used in this masonry are of different sizes and shapes. before lying, all projecting corners of stones are slightly knocked off. Vertical joints are not plumbed, joints are filled and flushed. Large stones are used at corners and at jambs to increase their strength. Once "through stone" is used for every square meter of the face area for joining faces and backing.Suitability: Used for construction of walls of low height in case of ordinary buildings.Coursed random rubble masonry: The random rubble masonry in which stones are laid in layers of equal height is called random rubble masonry. In this masonry, the stones are laid in somewhat level courses. Headers of one coursed height are placed at certain intervals. The stones are hammer dressed. Suitability: Used for construction of residential buildings, go downs, boundary walls etc.Squared rubble masonry: The rubble masonry in which the face stones are squared on all joints and beds by hammer dressing or chisel dressing before their actual laying, is called squared rubble masonry. There are two types of squared rubble masonry.Coursed Square rubble masonry: The square rubble masonry in which chisel dressed stones laid in courses is called coarse square rubble masonry. This is a superior variety of rubble masonry. It consists of stones, which are squared on all joints and laid in courses. The stones are to be laid in courses of equal layers. and the joints should also be uniform. Suitability: Used for construction of public buildings, hospitals, schools, markets, modern residential buildings etc and in hilly areas where good quality of stone is easily available.Un coursed square rubble masonry: The squared rubble in masonry which hammer dressed stones are laid without making courses is called un coursed square rubble masonry. It consists of stones which are squared on all joints and beds by hammer dressing. All the stones to be laid are of different sizes. Suitability: Used for construction of ordinary buildings in hilly areas where a good variety of stones are cheaply available.Dry rubble masonry: The rubble masonry in which stones are laid without using any mortar is called dry rubble masonry or sometimes shortly as "dry stones". It is an ordinary masonry and is recommended for constructing walls of height not more than 6m. In case the height is more, three adjacent courses are laid in squared rubble masonry mortar at 3m intervals.


What is the pressure required in 20 cubic meter?

How much crsand for 1 m3 concrete


How many cube test required for 1 cubic meter concrete?

0.2


How much air is required to burn 1 cubic meter of natural gas?

10