Want this question answered?
$5,000
how much does hotels cost in Jamaica
You calculate the total cost of 1 cubic meter reinforcement cement for heavy foundation work by adding all of the costs. Essentially you would have to figure out the total of pounds of concrete for 1 cubic meter multiply that by the cost per pound and then add in the cost of labor it takes to pour 1 cubic meter.
Are you looking for concreate? What are you using the foundation for. Let me know,
Costs vary by geographic location.
Best thing to do is contact the concrete company directly, because the price will vary by different mixes, and delivery fees will vary by distance traveled. You also need to know the desired depth of the concrete. Concrete companies sell it by the cubic yard, which is calculated by area and depth.
Here is an estimate from another site. http://en.allexperts.com/q/Building-Homes-Extensions-2333/slab-foundation.htm
How much does it cost to seal a concrete patio
The cost of concrete can depend on many factors such as:Grading: it is important to know whether the area is suitable for use with concrete. It is important to know if the project is medium or large scale. The cost is usually around $45 per hour.Foundation: is yet another important thing to know. Bigger projects will normally need Foundation and the foundation may require excavating and adding gravel. The cost of gravel should be about $12 per cubic yard.Other factors such as Cost of labor cannot be ignored. The fee is usually a dollar for every square foot. But there are other things like the number of hours and employees employed.
In June 2015, after careful review, the price to construct a new building in Jamaica varies from JAD$ 15,544.00 to JAD$ 58,000.00 (approx.US$ 134.00 to $500.00 per sq ft) and can exceed JAD$ 62,150.00 (approx. US$ 550.00 per sq. ft.)To build a timber structure (using Raft Foundation) in Jamaica varies from JAD$ 15,544.00 to JAD$ 23,432.00 (approx. US$ 134.00 to US$ 202.00) and up.To build a timber structure (using Strip and Pad Foundation) in Jamaica varies from JAD$ 19,836.00 to JAD$ 28,188.00(approx. US$ 171.00 to US$ 243.00) and up.To build a concrete structure using Strip and Pad foundation in Jamaica varies from: JAD$ 34,684.00 to JAD$ 58,000.00 per sq.ft. (approx. US$299.00 to US$ 500.00 per sq.ft.) or can exceed JAD$ 63,800.00 (approx. US$ 550.00).However, to build a concrete structure using Raft Foundation in Jamaica varies from: JAD$ 20,996.00 to JAD$ 40,368.00 per sq.ft. (approx. US$181.00 to US$ 348.00 per sq.ft.) or can exceed JAD$ 46,400.00 (approx. US$ 400.00).When building, the price to build are dependent on these factors:(i) The size of the building(ii) The shape and complexity of the building and it's design(iii) The buildings structural purpose and nature.(iv) The type of building materials to be used in and outside the building(v) The shape, complexity, and the topography of the land(vi) The structural nature and capacity (strength) of the soil(vii) The ease of accessibility to and from the building site(viii) The Labor and Administrative Costs(xi) Taxes to be paid (N.H.T.; N.I.S.; P.A.Y.E.; STAMP DUTY TAX; and LEVY TAX)The RED ZONE (the DANGER ZONE) for both clients and builders desiring to build would be below:(i) JAD$ 15,544.00 (US$134.00) for timber (using Raft Foundation);(ii) JAD$ 19,836.00 (US$171.00) for timber (using Strip & Pad Foundation);(iii) JAD$ 20,996.00 (US$ 181.00) for concrete (using Raft Foundation).(iv) and JAD$ 34,684.00 (US$ 299.00) for concrete ( using Strip & Pad Foundation);
The cost of concrete can depend on many factors such as:Grading: it is important to know whether the area is suitable for use with concrete. It is important to know if the project is medium or large scale. The cost is usually around $45 per hour.Foundation: is yet another important thing to know. Bigger projects will normally need Foundation and the foundation may require excavating and adding gravel. The cost of gravel should be about $12 per cubic yard.Other factors such as Cost of labor cannot be ignored. The fee is usually a dollar for every square foot. But there are other things like the number of hours and employees employed.
I think it is twice the cost of ready mix concrete?