Labor cost is variable cost because labor is paid for every single unit of product is made. For example if labor cost for making 1 unit is 10 then making 10 units will be 100 so as much as production level changing labor cost changing that;s why it is variable cost.
Average direct labor cost is the opening direct labor cost + closing direct labor cost / 2
If indirect labor change with the change of units of product then indirect labor is a variable cost. If change in the quantity of units has no impact on indirect labor cost then it is a fixed cost.
If direct labor cost creates impact or influences the decision then it is relevant cost but if direct labor is not creating influence or changing in decision then it is irrelevant cost for example direct labor cost remain same irrespective of whatever the decision then direct labor cost is also irrelevant.
Labor at parts at a local GMC dealership was $786.00.
How much does labor cost to replace a shift solenoid in a ford focus?
How much does it cost for labor to change a timing chain in a 2001 Alltima ?
cost of materials and labor
Labor cost is variable cost because labor is paid for every single unit of product is made. For example if labor cost for making 1 unit is 10 then making 10 units will be 100 so as much as production level changing labor cost changing that;s why it is variable cost.
Six hours of labor to replace your 1998 Chevrolet Cavalier clutch. The cost will be determined by the labor rate. $75 an hour for labor will cost $450.
$40.00 to $50.00 labor
as much as the union wants it to be
how much does it cost for labor to change a knock sensor in a 2002 toyota siennna van
Labor cost variance means the difference between standard labor cost and actual labor cost.
It cost me $185.00. That includes $85 for new reservoir tank and coolant & $100 labor.
About 200$ for parts and labor
Average direct labor cost is the opening direct labor cost + closing direct labor cost / 2