answersLogoWhite

0


Best Answer

These pyramids were generally built of earth and faced with stone; they are typically stepped pyramids and are topped by a platform or temple structure used for rituals. The Egyptian workers(artisans, craftsmen, etc) make the blocks for the outer pyramid (limestone) and the inner walls (granite).
Shortly after coming to the throne the Pharaoh would command his overseer of public works and architects to prepare a burial place in keeping with his status as a god-king, a launching pad to enable his soul to soar from the earth to join the gods and his ancestors in the heavens. The chosen site had to be on the west bank of the Nile where the sun set. The first stage was for the royal survey team to mark out the site. Great care was taken in orientating the site to the four points of the compass and in levelling the site to provide a foundation for the pyramid. When the slaves had cleared away the sand and rubble highly skilled masons were called in to level the foundations. This was done by cutting a grid of channels and filling them with water. The rock was then cut back to the water level to make it perfectly flat. Finally the water was drained away and the channels filled with rubble. At any one time as many as 20,000 workers may have been involved on this massive project. Some of them were free men doing particular tasks such as masons, tool makers, carpenters, scribes and overseers. Many of course were unskilled slave labourers. Most if not all of the slaves were naked. From the depression of the quarry come the clink-clink of copper chisels and the thump of rock hammers of the quarry slaves toiling under the hot sun. Their naked bodies are covered from head to foot with white dust giving them the appearance of ghosts. After the stone blocks are extracted from the quarry face they are lowered onto sledges and a mark is made on the stone by one of the scribes. This aided them to place the blocks in the pyramid just as they came out of the quarry ensuring a better fit than random blocks without further finishing. From dawn to dusk, gangs of slaves drag the sledges loaded with stones each weighing about two tons to staging areas at the base of the pyramid. Most of the stone blocks proceed up the ramp without future handling. Only a fraction of the stone blocks needed to be cut to precise dimensions by the masons. The slaves hauled the loaded sledges slowly up the clay and rubble ramp. Whether it was a single long or spiralling ramp depends on the size of pyramid. When the sledges reached the working level teams of slaves called setters shifted the blocks from the sledges into their designated positions. These naked men used only simple levers, brute force and experience gained from years of hard labour. Once the stones had been delivered the hauling gang would make their weary way down the ramp carrying their sledge, in order to make the same back breaking journey up as they would several times a day. Other slaves are employed in maintaining and extending the ramps as the pyramid grew. These ramps are made of rubble, bound together with desert tafla (a type of clay) and laid with planks to ease the passage of the sledges. Rows of slaves are seen breaking up waste material from the quarries, mixing them with the tafla and loading the finished mixture into baskets. Individual baskets are loaded onto the shoulders of slaves for delivery to the ramp builders on the pyramid. Granite came from Aswan located 400 miles to the south. Granite was used for the lining of the burial chamber and the internal passage leading to it or in some instances the lower courses of the pyramid. These blocks were the largest in size used on the structure, for example, some of the granite stones used on the Great Pyramid at Giza weighs up to 70 tons. Copper chisels used for quarrying limestone could not be used, a harder material was required. Balls of dolerite, a hard, black igneous rock, were used in the quarries of Aswan to extract the hard granite. These dolerite "pounders" were used to pulverize the stone around the edge of the granite block that needed to be extracted. Teams of slaves pound away for weeks in order to expose enough stone for the block to be extracted from the quarry. At the bottom, they ram wooden pegs into slots they have cut, and fill the slots with water. The pegs will expand and split the rock with a resounding crack much more impressive than anything heard with the softer limestone. With much cursing and sweat the slaves lower the great blocks onto sledges. As many as two hundred slaves, their naked bodies gleaming with sweat, drag the loaded sledges along a causeway to the river where they are loaded unto barges and floated downriver with the current to the pyramid site.

User Avatar

Wiki User

8y ago
This answer is:
User Avatar
More answers
User Avatar

Wiki User

12y ago

If you want a thorough explaination of how the pyramids were built, I highly recomend the book 'Pyramid' by David Macaulay.

It specifically talks about the Great Pyramid of Giza, but I believe the method Mr. Macaulay explains seems reasonable for the other pyramids.

This answer is:
User Avatar

User Avatar

Wiki User

6y ago

Shortly after ascending the throne in 2589BC, Pharaoh Khufu commanded Hemiunu his overseer of works to prepare a burial place in keeping with his status as a god-king, a pyramid tomb far grander than anything that had been built before or since. A site was chosen on the Giza plateau west of the Nile across from his capital at Memphis. The site was surveyed and levelled to provide a foundation for Khufu's Great Pyramid.

As the slaves cut the first stones for the pyramid from nearby quarries, thousands more began building the causeway, erecting storehouses and digging a canal to link the foot of the plateau to the Nile. Meanwhile scribes, the Pharaoh's project managers, dispatched orders for more supplies.

A town was built for the crafts people where they were provided with houses, food, clothing and even medical care. Less comfortable accommodation in the form of barracks was provided for the slaves.

Through Khufu's reign, the construction site teemed with workers of all kinds hard pressed to complete the monument before the king's death. Khufu and his architects did not make it easy for them. The royal planners decided to enlarge the structure several times and relocate the burial chamber from beneath the structure to its inner reaches. Day after day, year after year, the quarries rang with the sound of hammer and chisel on stone. Through the dust the dusky bodies of naked quarry slaves stand out against the yellow stone. After the stone blocks are hacked out of the quarry face they are lowered onto sledges. A note of each load is taken down by a scribe.

From dawn to dusk, naked slaves dragged sledges loaded with stones each weighing about 2.5 tons each to staging areas at the base of the pyramid. Here the skilled masons chiselled the blocks to prescribed dimensions, smoothed the sides and squared the corners. Slaves then reloaded the sledge and began hauling them slowly up the ramp that spiralled around the emerging structure. The noise here was one of chanting slaves, the rumble of heavy sledges and the swish of the overseer's lash as its thong whistles through the air. With deadly accuracy it found its target, as it coiled around the unprotected body of a slave.

When the sledges reached the working level teams of slaves called setters shifted the blocks from the sledges into their designated positions. Toiling below were the tool makers, cooks, porters and guards under the watchful eyes of the scribes.

Other slaves were employed in maintaining and extending the ramps as the pyramid grew. These ramps were made of rubble, bound together with tafla (a type of clay) and laid with planks to ease the passage of the ramps.

Barges made from papyrus reeds deliver fine limestone from Tura just across the river and granite from Aswan over 400 miles upriver. Some of the granite stones from Aswan weighed up to 70 tons. Copper chisels were using for quarrying limestone but harder stones such as granite required stronger materials. Balls of dolerite, a hard, black igneous rock, were used in the quarries of Aswan to extract hard granite.

These dolerite "pounders" were used to pulverize the stone around the edge of the granite block that needed to be extracted. Teams of 60 to 70 slaves would pound out the stone. At the bottom, they rammed wooden pegs into slots they had cut, and filled the slots with water. The pegs would expand, splitting the rock. Slaves would then slide the blocks onto the barges.

At any one time as many as 30,000 workers may have been involved on this massive project. Some of them were professional craftsmen most however were slaves.

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How were the Egyptian pyramids made?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What were the egyptian pyramids made for?

to socialize


What were the Egyptian social pyramids made for?

to socialize


When where pyramids made?

in the Egyptian times you idiot are you dumb?


Were pyramids built from aleins?

No. Egyptian's made the pyramid's.


Is there a scientific reason how they made the pyramids?

No it was purely egyptian religion


Why were pyramids the most important invention in ancient Egyptian time?

the pyramids were and still is the most important invention in ancient Egyptian time because, the pyramids were made for the kings and pharaoh and in Egyptian times they were the most important people in Egypt.


Who made Egyptian pyramids?

the pharaoh gto the slaves and farmers to build them


Are Egyptian pyramids made of sand?

No, Egyptian pyramids are not made of sand. They are primarily made of limestone blocks, with granite used for some of the inner chambers and casing stones. Sand may have been used in the construction process for leveling the base and as a construction material for mortar.


What is an ancient Egyptian pyramid made of?

the ancient egyptian pyramids are made of 1000 bricks and the very first mummy was King and Queen's


Country of Egyptian pyramids?

The Egyptian Pyramids are located in Egypt, hence their name.


What desert is the Egyptian pyramids in?

The Egyptian pyramids can be found in the desert of Giza, after which they are named.


What has the author Everett W Fish written?

Everett W. Fish has written: 'Egyptian Pyramids' 'The Egyptian pyramids' -- subject(s): Pyramids. 'The power behind the throne' 'The Egyptian pyramids' -- subject(s): Pyramids