The exact cost to construct an asphalt road varies according to the conditions , terrain type , population of area etc. Cost is almost 8 million Euros for 1 km.
Asphalt is fairly cheap and durable.
It is cold planing - or milling - of the asphalt surface. This is done for a number of reasons including the following: -Removing ruts or bumps or irregularities in a roadway before resurfacing. -Lowering a road surface that is to be resurfaced or treated so that it fits the profile of adjacent roads. -Removing existing asphalt that is found to be unacceptable.
Unfortunately this depends on many things. An asphaltic highway will vary in construction depending on countless factors. Firth you will need to design your highway makeup. for a surface course and binder I'd say 100mm is about normal the base (if asphaltic and not another unbound or bound material) about 400mm (depending on foundation design) the subbase will need to be design but would normally not be asphaltic So say you have 0.5m of asphaltic material depth. Multiply this by the width of the width of the road to give you an area . 0.5 x width of road As a very very loose guide of the density of asphalt take (it vary greatly depending on aggregate, penetration etc.) 2200kg/m3 10168000kg divided by density will give you the volume 10168000/2200 = 4622 m3 4622 m3 / (0.5m x width of road m) = very approximate length of road i.e 4622m3 /(0.5 x 7m)= 1.3km for a single carriageway two lane road at 7m width
Asphalt roads look similar in nature to concrete because both use an aggregate material consisting of rocks to make up as much as 60% of the volume of the final solid material.
Asphalt roads are considered to provide the best traction for automobiles in most conditions. Concrete roads will provide better traction in high temperature areas.
$24,950
An asphalt road is considered heterogeneous. This is because the asphalt in the road is not uniform or constant in structure.
What is a square foot cost for grinding asphalt 2"
yield to vehicles traveling on a divided street or roadway or vehicles traveling on a roadway with three or more lanes
Park Lane Road in London, EnglandPark Lane Road in London, EnglandPark Lane Road in London, EnglandPark Lane Road in London, EnglandPark Lane Road in London, England
Park Lane Road in London, EnglandPark Lane Road in London, EnglandPark Lane Road in London, EnglandPark Lane Road in London, EnglandPark Lane Road in London, England
Road tar is made from coal. Asphalt is a heavy fraction of petroleum.
A paved road. Metalled road.
If there are two lanes (one in each direction) why is there a need for any driver to yield). If it is a single track road, then there will be passing places (pull ins) and the driver nearest to one should be the one that uses it. In cases where a two lane road narrows to a single lane road for a short stretch, this point will either be controlled by lights or will have road signage indicating which direction of traffic has priority.
please give me information about asphalt road estimetion 6m wide and 1km long
no
6500/- near ctc,park lane ,sp road,secunderabad