Traditionally project time is the duration between the project start and the project end, sometimes known as the overall project duration. Within the project duration there are a series of activities that may or may not have logical dependencies. Scheduling allows an estimate of time for each of the individual activities. By taking into consideration the project context, the project requirements, available resources and budgets, a critical path (single or multiple) of activities through the project can be determined. This critical path represents the sequence of activities through a project network from the project start time to the project end time, the sum of whose durations determines the overall project time. If this critical path exceeds the time allowed to complete the project, then the project needs to be re-planned, such as adding additional resources, subcontracting out work, conducting up front de-risk work or taking advantage of opportunities that may arise after the start of the project.
what is slack in project management
no difference
No, maximising throughput does not necessarily mean maximising turnaround time. Throughput is a measure of how many operations can be performed in a period of time. Turnaround is a measure of how long it takes to perform an operation. If you optimize latency and/or overhead, you can increase throughput and decrease turnaround time. On the other hand, if you create parallel processing, you can increase throughput without decreasing turnaround.
Turnaround time is the interval between the submission of a job and its completion. Response time is the interval between submission of a request, and the first response to that request.
time lab test results is done
6-12 minutes
the time required from time you receive a work until you complete it
b jnkmk;ou n
time need to prepare a vessel or ship for a return trip.
A customer submits their claim form with estimates, photos, invoices etc. on a certain date. After processing, at a later date the claim is settled. The time difference between receiving and settling the claim is the turnaround time.
Example: Turnaround Time: P1 : 24, P2 : 27, P3 : 30 - Average TT: (24 + 27 + 30)/3 = 27