6-12 minutes
Example: Turnaround Time: P1 : 24, P2 : 27, P3 : 30 - Average TT: (24 + 27 + 30)/3 = 27
Average Turn Around Time = Completion Time - Arrival TimeAverage Waiting Time = Turn Around Time - Burst(execution) Time
about 3 working days
bgygjjhuhuj
No, maximising throughput does not necessarily mean maximising turnaround time. Throughput is a measure of how many operations can be performed in a period of time. Turnaround is a measure of how long it takes to perform an operation. If you optimize latency and/or overhead, you can increase throughput and decrease turnaround time. On the other hand, if you create parallel processing, you can increase throughput without decreasing turnaround.
c program for shortest remaining time scheduling algo
Turnaround time is the interval between the submission of a job and its completion. Response time is the interval between submission of a request, and the first response to that request.
time lab test results is done
the time required from time you receive a work until you complete it
The university solved slips for third year Bsc Computer Science are usually issued after the students satisfy the conditions set out by the examination body. The students also have to meet the conditions set out by the senate.
b jnkmk;ou n
time need to prepare a vessel or ship for a return trip.