2.5 times of design load
pile is the steel layer and pier is the outer most layer'
Primarily to a) determine the safe load of an engineered structure and b) to help design a structure given a particular load to be borne.
Either the load is changing or there is something wrong with the testing method or there is no voltage regulation and the voltage is varying wildly.
Let me explain with an example. Yahoo has a website. We know that million of people are going to access this site every day. In fact thousands will be clicking this website at same movement of time. But Yahoo has limited hardware capability. Now they want to know how many people can access their website (hitting their servers) at the same time. 1. Load testing - is expected rate is matched? Yahoo estimated that a maximum of 90,000 people (example) can hit at any point of time. So load testing is performed that whether with 90,000 virtual users system is performing well or not? 2. Stress testing - if we slowly increase users from 90,000 to say 91,000 then to 92,000 then to 93,000 and so on...then at what time servers crash or site stopped responding? 3. Performance testing - Suppose with one user yahoo page opens in 1 sec. Then with 1000 users is it opening in 1 sec? then with 50,000 users hitting website at same time, is it opening in 1 sec....so what is performance of website up to a desired level? (up to 90,000 in this example) ************* Above are good differences. I got clear 10 differences between load and stress testing with example conceptsimplified.com/compare/load-stress-testing/
In simple words, It basically determines the load bearing capacity of rock below the earth surface. If soil is weal enough that it can not support the load, then we bore below earth and find out rock location and conduct pile load testing to measure load bearing capacity. For example, pile foundation are provided are provided in highway bridge foundations if soil is weak...... Geotechnical Engineering.......
The question itself is not correct.It should be what is the ultimate load carrying capacity of bored pile?Ans: Ultimate load carrying capacity of pile could be determined be conducting load test.Ultimate load:The load at which the pile continuously settle.orthe load at which settlement of the pile reaches 10 percent of its diameter
Functionality testing is what is expected. Load testing is what it actually did.
allowable structural capacity
This can be done by physically loading the pile by a test load which is 1.5 times the design load on the pile, or by other indirect methods like dynamic test methods. D mohan
2.5 times of design load
Stress testing means increasing the load ,and cheking the performance at each level. Load testing means at a time giving more load by the expectation and checking the performance at that leval. Volume testing means first we have to apply initial load,then at certain time increase the load and check the performance.
There are several solutions for balancing the load of web applications. There are several Application load balancing softwares available.
IS 2911 part 4
The difference between static load testing and dynamic load testing is that with static load testing a certain percentage of a product is tested against a group of specifications. During dynamic testing each individual product is tested against a group of standards based on previous tests.
explain why all the load must be removed when to conduct the insulation and resistance testing
You will increase the amp load on the battery.