In simple words, It basically determines the load bearing capacity of rock below the earth surface. If soil is weal enough that it can not support the load, then we bore below earth and find out rock location and conduct pile load testing to measure load bearing capacity. For example, pile foundation are provided are provided in highway bridge foundations if soil is weak......

Geotechnical Engineering.......

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

What is ultimate load test to bored pile?

The question itself is not correct.It should be what is the ultimate load carrying capacity of bored pile?Ans: Ultimate load carrying capacity of pile could be determined be conducting load test.Ultimate load:The load at which the pile continuously settle.orthe load at which settlement of the pile reaches 10 percent of its diameter


What are the applications of pile load testing?

Pile load testing is primarily used to determine the load-bearing capacity of piles in foundation engineering. It helps ensure the structural integrity and safety of buildings and bridges by verifying that piles can support the expected loads. Additionally, it aids in the design process by providing empirical data for load distribution, settlement, and overall performance of the foundation system. Pile load testing is also critical for quality control during construction and can identify any potential defects or weaknesses in the piles.


What is allowable structural capacity of pile in pile load test?

allowable structural capacity


How can check the capacity of pile foundation?

This can be done by physically loading the pile by a test load which is 1.5 times the design load on the pile, or by other indirect methods like dynamic test methods. D mohan


What are the field tests carried out on piles?

displacement pile


What are field tests carried out on piles?

displacement pile


What is the maximum Test Load on Pile have been carried out?

2.5 times of design load


How much power is needed to supply the losses associated with the production of the magnetic field in a 3-phase motor?

You need to conduct No load and full load losses tests to determine the losses.


What is the is code for pile load test?

IS 2911 part 4


What is the purpose of OC and SC tests on single phase transformer?

Open circuit and short circuit tests are performed to determine transformer characteristics. In the case of a single phase transformer, SC tests would be performed to determine the impedance. The open circuit test will give excitation information (% excitation at specific voltages, often 90%, 100% and 110%, and no load losses).


How do you measure a pile of dirt?

The pile of dirt is measured by the area it covers in a given area. The circumference of the pile can be taken so as to determine the area under which the pile of dirt is.


When using a carbon pile to load test a battery what occurs as you turn the control knob clockwise?

You will increase the amp load on the battery.