In simple words, It basically determines the load bearing capacity of rock below the earth surface. If soil is weal enough that it can not support the load, then we bore below earth and find out rock location and conduct pile load testing to measure load bearing capacity. For example, pile foundation are provided are provided in highway bridge foundations if soil is weak......
Geotechnical Engineering.......
The question itself is not correct.It should be what is the ultimate load carrying capacity of bored pile?Ans: Ultimate load carrying capacity of pile could be determined be conducting load test.Ultimate load:The load at which the pile continuously settle.orthe load at which settlement of the pile reaches 10 percent of its diameter
Pile load testing is primarily used to determine the load-bearing capacity of piles in foundation engineering. It helps ensure the structural integrity and safety of buildings and bridges by verifying that piles can support the expected loads. Additionally, it aids in the design process by providing empirical data for load distribution, settlement, and overall performance of the foundation system. Pile load testing is also critical for quality control during construction and can identify any potential defects or weaknesses in the piles.
allowable structural capacity
This can be done by physically loading the pile by a test load which is 1.5 times the design load on the pile, or by other indirect methods like dynamic test methods. D mohan
displacement pile
displacement pile
2.5 times of design load
You need to conduct No load and full load losses tests to determine the losses.
IS 2911 part 4
Open circuit and short circuit tests are performed to determine transformer characteristics. In the case of a single phase transformer, SC tests would be performed to determine the impedance. The open circuit test will give excitation information (% excitation at specific voltages, often 90%, 100% and 110%, and no load losses).