What is ultimate load test to bored pile?

The question itself is not correct.It should be what is the ultimate load carrying capacity of bored pile?Ans: Ultimate load carrying capacity of pile could be determined be conducting load test.Ultimate load:The load at which the pile continuously settle.orthe load at which settlement of the pile reaches 10 percent of its diameter


What is the allowable eccentricity of pile?

Pile eccentricity will allowable up to maximum 75mm. Above that we can proceed pile cap works by increasing the size of pile cap.


How can check the capacity of pile foundation?

This can be done by physically loading the pile by a test load which is 1.5 times the design load on the pile, or by other indirect methods like dynamic test methods. D mohan


What do pile load tests determine?

In simple words, It basically determines the load bearing capacity of rock below the earth surface. If soil is weal enough that it can not support the load, then we bore below earth and find out rock location and conduct pile load testing to measure load bearing capacity. For example, pile foundation are provided are provided in highway bridge foundations if soil is weak...... Geotechnical Engineering.......


What is allowable eccentricity for pile?

Concrete piles cannot be driven at precise intended location; This is true for bored piles also. For practical reasons various country design codes restrict the permissible deviation. In Indian code this value is specified as 75 mm. This plays important role in pile-cap design. The deviation smaller than this will never be reported. So pile cap sizing needs to be based on the worst possible direction deviation. The pile eccentricity is one of the important aspects in pile cap shear strength calculation as well as pile cap reinforcement calculation.


How do you measure eccentricity of pile?

The eccentricity of a pile is typically measured by determining the horizontal distance between the pile's centerline and the applied load or resistance. This measurement is crucial in structural design to ensure the pile can safely bear the intended loads without excessive deflection or failure. Eccentricity must be within specified limits to prevent structural issues or stability concerns in pile-supported structures.


Is a pier a pile foundation?

pile is the steel layer and pier is the outer most layer'


What is the maximum Test Load on Pile have been carried out?

2.5 times of design load


What is the is code for pile load test?

IS 2911 part 4


Briefly explain the difference between the end bearing piles and the friction piles?

4. End-bearing piles. Typical end-bearing piles aredriven through very soft soil, such as a loose silt-bearingstratum underlain by compressible strata. Rememberthis factor when determining the load the piles cansupport safely.5. Friction piles. When a pile is driven into soil offairly uniform consistency and the tip is not seated in ahard layer, the load-carrying capacity of the pile isdeveloped by skin friction. The load is transferred to theadjoining soil by friction between the pile and thesurrounding soil. The load is transferred downward andlaterally to the soil


What is the minimum length of pile foundation?

its depend on the soil bearing capacity


What is the definition of pile driving?

The definition of pile driving is putting a structural support in the ground. This support is usually added to evenly distribute weight among several supports.