Want this question answered?
Lead time is typically used to specify how long the delivery of a piece of equipment will take from purchase order to delivery. Cycle time is the amount of time measured in seconds or minutes a piece of equipment operates at. This is measured from the start of one cycle to the start of the next cycle.
the water vapor takes a short time
What are the 3 parts of the time cycle
Your criteria is(goals) and constraints are(limits).
The Sequence events of the cell cycle isinterphaseprophasemetaphaseanaphasetelophase.
The constraints in an engineering project include scope, time, quality and budget.
Common constraints in a project include time, cost, scope, and quality. They are called constraints because they limit the project's flexibility and resources. Effectively managing constraints is critical to the success of a project.
Simple
Lead time is typically used to specify how long the delivery of a piece of equipment will take from purchase order to delivery. Cycle time is the amount of time measured in seconds or minutes a piece of equipment operates at. This is measured from the start of one cycle to the start of the next cycle.
i think "order to remittance cycle" is the full cycle of an order, from order entry to the shipment
The activity network does NOT represent the time component of a PFD because it does not take account of resource constraints, which includes time. It identifies the tasks that have to be carried out and the order in which they have to be executed.
He should adhere to the time constraints.
He should adhere to the time constraints.
simple prioritization
find the cycle time which is the ratio between the target production volume and the available time. This time will be the maximum time given to every single workstation.rank the jobs according to the processing time.assign the job that has no precedence constraints first. When two jobs or more have no precedence constraints, select the one with the smallest processing time and put it in the first workstation; add more jobs until the total of the job times reaches the time allocated to the workstation; in this case, open another work station.remove the assigned jobs from the precedence constraints of other jobs.repeat until all jobs are assigned.This problem is referred to as line balancing.
time constraints basically means lack of time or shortage of time to do a particular task or activity. time restraints means a situation where one is unable to reach a specified goal set earlier, on account of time shortage.
The primary constraints are scope, time, quality and budget.