answersLogoWhite

Top Answer
User Avatar
Wiki User
Answered 2013-06-14 02:21:08

TCH drop due to bad quality

001
๐Ÿ™
0
๐Ÿคจ
0
๐Ÿ˜ฎ
0
๐Ÿ˜‚
0
User Avatar

Your Answer

Loading...

Still Have Questions?

Related Questions

What is the population of Path social network?

The population of Path - social network - is 25.


Which path will traffic from the 172.16.1.0 24 network take to get to the 10.0.0.0 24 network?

ADC ABC It will load balance the traffic between ADC and ABC It will send the traffic via ABC, and will use ADC as a backup path only when ABC fails.


What are the causes of delay jitter?

Delay jitter is caused by queuing, contention and sterilization effects on the path through the network.


When was Path - social network - created?

Path - social network - was created in 2010.


Where is the world's largest bike path network?

The worlds largest bike path network is in Bogota Colombia


What is the difference between system path and network path?

when you use a system path you are accessing data on your computer usually on your C drive or your E drive. a network path is to another system on the network. for example, "//computername/sharedfolder/document.doc"


What is an unstructured network in peer to peer network?

The Network which use more than one path for a single node. It is basically non-path based


What causes the path of a projectile to be curved?

The gravitation forces are what causes the path of a projectile to be curved.


What is a virtual path in computer networking?

mirror the actual path of the network


A labyrinth is _______.?

a complex network of pathA+


How do you explain the critical path analysis?

Critical path method - This is the schedule network analysis technique used to identify the schedule flexibility and the critical path of the project schedule network diagram. The critical path is the longest path (sequence of activities) in a project schedule network diagram. Because it is the longest path, it determines the duration of the project and hence the finish date of the project given the start date.


How can you know how many computers are path your network?

The route via Path B is installed because the EIGRP route has the best metric to network 10.2.0.0/16. The route via Path A is installed because the static route has the best metric to network 10.2.0.0/16. The route via Path B is installed because the EIGRP route has the lowest administrative distance to network 10.2.0.0/16. The route via Path A is installed because the static route has the lowest administrative distance to network 10.2.0.0/16.


How does the network layer facilitate data encapsulation?

The network layer facilitates data encapsulation by deciding the physical path that the data should take to its destination. Determining the path depends on the priority of the service and network conditions.


What does the tracert command test?

the network path to a destination


Which part of a Network Layer address does the router use during path determination?

The network address


What is purpose of the TCPIP network access layer?

Path determination and packet switching Edit - The correct answer is Network media control, path determination and packet switching is done by the routers.


What is cpm and pert?

Critical Path Method (CPM) - A schedule network analysis technique used to identify the schedule flexibility and the critical path of the project schedule network diagram.


What causes a stream to change its path?

weathering


What is a switch in a computer network?

A swith is a device over a network that routes traffic towards the best available path.


Which network topology provides a redundant path to transmit data?

bus


The process of determining the best path from point A on one network to Point B on another network is know as?

This is known as routing.


What are the uses of the critical path?

These critical path enables PMs to know which activities (tasks) are essential for Project Completion (can delay the project), and which activities are not. It also gives a clear idea on how to accelerate the projects (eg by adding more resources to the tasks on the critical path).Answer:Critical Path Method: This is the schedule network analysis technique used to identify the schedule flexibility and the critical path of the project schedule network diagram. The critical path is the longest path (sequence of activities) in a project schedule network diagram. Because it is the longest path, it determines the duration of the project and hence the finish date of the project given the start date


What is path in Microsoft Word?

The "path" of a MS Word document is the place where the file is saved (on your computer, a network share, or another place)


How do you get path of the jedi on Cartoon Network to work?

don't know it worked earlier


The physical path or a frequency used to connect the nodes of a network?

communications channel