-A cost baseline from a previous similar project that's used to assess potential changes to the current project

-A request to correct a scope overrun after a team member added functionality not required to a product, affecting time and schedule forecasts

-A change control procedure for fast tracking and important change

-A request that the widget cutting process is changed after quality control processes find a high number of widgets larger than specification

User Avatar

Angus Mraz

Lvl 10
3y ago

What else can I help you with?

Related Questions

How are the monitor and control project work and perform integrated change control process linked?

Change requests generated as a result of monitoring and control activities become an input the Perform Integrated Change Control Process


How are the monitor and control project work and perform integrated change control processes linked?

Change requests generated as a result of monitoring and control activities become an input the Perform Integrated Change Control Process


What are the outputs of the perform integrated change control process?

The outputs of the Perform Integrated Change Control process include approved change requests, which may involve modifications to project scope, schedule, or budget. Additionally, updates to project documents and plans are generated to reflect these changes, ensuring that all stakeholders are informed. Finally, lessons learned documentation may be produced to capture insights gained during the change process for future reference.


Process that does not change the identity of a substance?

A physical process does not change the chemical identity of a substance. Examples include changing the state of matter (like melting or freezing), dissolving, or distillation.


What are some examples of changes?

A mixture of salt and sand is an example of a physical change since the process is reversible.


What examples are are inputs to the Perform Integrated Change Control Process?

-A cost baseline from a previous similar project that's used to assess potential changes to the current project -A request to correct a scope overrun after a team member added functionality not required to a product, affecting time and schedule forecasts -A change control procedure for fast tracking and important change -A request that the widget cutting process is changed after quality control processes find a high number of widgets larger than specification


What key principles of the perform integrated change control process should you follow?

-Project baselines should be changed only when necessary -Approved changes must be coordinated -The impact of change requests must be documented


What key principles of perform integrated change control process should you follow?

-Project baselines should be changed only when necessary -Approved changes must be coordinated -The impact of change requests must be documented


What is endothermic change?

endothermic change is a change, in which heat from outside is observed by reactants, leaving the surrounding cooler. Examples are evaporation of water, alcohol and dissolving glucose in water.


What is process represents a chemical change?

A chemical change is a process that results in the formation of new substances with different chemical compositions from the original substances. This process involves the breaking and forming of chemical bonds between atoms. Examples of chemical changes include burning, rusting, and digestion.


What are barriers to successful implementation of Integrated Product and Process Development IPPD?

Poorly run meeting or reviews Contractor uses IPPD / DoD does not Need for significant cultural change


What are the barriers to successful implementation of Integrated Product and Process Development?

Barriers to successful implementation of Integrated Product and Process Development (IPPD) include organizational silos that hinder collaboration across departments, leading to fragmented communication and decision-making. Additionally, a lack of alignment between teams on goals and objectives can create confusion and inefficiencies. Cultural resistance to change and insufficient training in integrated approaches further complicate the adoption of IPPD practices. Lastly, inadequate resources or investment in technology can limit the ability to effectively integrate product and process development efforts.