civil ,software, electronics, chemical, textile . i think so
Civil Engineering.
Mechanical Engineering.
Electrical Engineering.
Chemical Engineering.
Computer Engineering.
Software Engineering.
Learn , understand that concept, research, innovative, produce products, crrct the errors
Gandhi engineering college is offering many type of engineering and management courses. Gandhi engineering college is providing placement opportunities also every year GEC achieved by 95% placement results. Gandhi engineering college is best education providing compare than top 10 government engineering colleges in odisha. Gandhi engineering college is one of the top 10 engineering colleges in orissa. GEC, holds the title of "Best T School" status in Odisha. It has secured the first position in NPTEL Local Chapter among all private Engineering colleges in Odisha
To visit
gec.edu.in
GEC offers courses like,
B.TECH / B.TECH(LE)
Computer Science & Engineering
Computer & Electronics Engineering
Computer & Electrical Engineering
Electronics & Communication Engineering
Mechanical Engineering
Civil Engineering
M.Tech
Computer Science & Engineering
Communication System Engineering
Power Electronics and Drivers
Structural Engineering
Thermal Engineering
MBA
Marketing & Sales Management
Marketing & Finance
Entrepreneurship
Rural Management
Business Management
DIPLOMA
Civil Engineering
Electrical Engineering
Mechanical Engineering
Mechanical Engineering Automobile
Electrical & Mechanical Engineering
OTHER COURSES
BBA / BCA / BSc (CS / ITM)
Surveying Architectural works or design Structural works Approval Tendering Construction
inception, elaboration
build a prototype....- glads to help(;
A rate-governed or rate-limiting process is a process in which there are several steps; however, the rate of one or more steps is much slower than all the others. The rates of the previous steps and following steps are assuming to be infinite, and the rate of the process only depends on the rate-limiting step(s).
Process re-engineering life, it contains the complete life cycle of how the process is changing. What are the steps to change the process. It is closely related to Business process re-engineering. The steps of PRLC are: 1) Envision: In it, it is checked the secured commitment with the top management. Then we have to proceed. 2) Initiate Change: After checking the commitment form the top management, we have to initiate the new change what we are going to made in the process. 3) Process Analysis: Then we have to analyze the whole process and have to identify what are the necessary changes to the process. 4) Process Re-design: Then we have to re design the process by implementing all the necessary changes to a process. 5) Constructing: In it, we are implementing all the changes that are required to re-desing a process. 6) Implementing and maintaining: In it, we are implementing all the changes to a process and then last step is to maintenance of the process.
Surveying Architectural works or design Structural works Approval Tendering Construction
i dont know the process but its like 6 steps!! i dont know the process but its like 6 steps!! i dont know the process but its like 6 steps!!
inception, elaboration
To have little room for errors.
Identify a needKnow the backgroundMake a planDo the workTest the resultedEvaluate and redesign-Apex
build a prototype....- glads to help(;
A rate-governed or rate-limiting process is a process in which there are several steps; however, the rate of one or more steps is much slower than all the others. The rates of the previous steps and following steps are assuming to be infinite, and the rate of the process only depends on the rate-limiting step(s).
6
Process re-engineering life, it contains the complete life cycle of how the process is changing. What are the steps to change the process. It is closely related to Business process re-engineering. The steps of PRLC are: 1) Envision: In it, it is checked the secured commitment with the top management. Then we have to proceed. 2) Initiate Change: After checking the commitment form the top management, we have to initiate the new change what we are going to made in the process. 3) Process Analysis: Then we have to analyze the whole process and have to identify what are the necessary changes to the process. 4) Process Re-design: Then we have to re design the process by implementing all the necessary changes to a process. 5) Constructing: In it, we are implementing all the changes that are required to re-desing a process. 6) Implementing and maintaining: In it, we are implementing all the changes to a process and then last step is to maintenance of the process.
Can you give and example of an engineering process?
There are many varieties of engineering classes which means there are different steps but here are some engineering jobs. Take this in mind that this is only Average Mechanical- 15 steps Electrical- 7 steps Robotics- 5 steps
The 6 steps are Define problem, Generate concepts, Develop a soulution, Construct and test prototype, Evaluate soution, and Present solution.