answersLogoWhite

0


Want this question answered?

Be notified when an answer is posted

Add your answer:

Earn +20 pts
Q: What is the average labor cost to install shift cable on 2003 trailblazer?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the average labor cost to install metal roof?

The average labor cost to install a metal roof depends on many different things. Some of them include the location in the country, the pitch of the roof, and the availability of labor.


What is the average labor cost to install metal roof trusses?

60062


What is the average labor cost to install fiber cement siding in Georgia?

cost of labor installing fiber ends


What is the average cost for labor to install an alternator in a cadillac deville 1999?

460.00 dollars


Labor time on transmission for a 2002 trailblazer?

9 hours


How much does the labor alone cost to install the shift solenoid since you already have the part on average?

How much does the labor alone cost to install the shift solenoid on a 2000 volvo s 70 5 speed.


How much do you have to pay a plumber to install a fixture?

The cost will reflect an average of labor time and materials involved to install the fixture, a cost range is appropriate as an estimate


What is the labor time to change a thermostat on a 2004 Chevy Trailblazer?

remove and replace engine coolant temperature(ect)/chevy 2004 trailblazer


What is the average cost per square foot to install VCT tile?

$3 dollars per square foot labor $1 dollars average material cost per square foot Add for hourly labor costs for sub floor prep work $4 - $5 dollars average cost for labor and materials 20% - 40% average profit margin, varies with workforce wages


How much labor time to replace transmission cooler lines 02 trailblazer?

i got quoted 12 hours


Can you install murphy beds yourself?

Yes, you need the proper tools and labor to install it.


What should you charge per square foot to install VCT?

$3 dollars per square foot labor $1 dollars average material cost per square foot Add for hourly labor costs for sub floor prep work $4 - $5 dollars average cost for labor and materials 20% - 40% average profit margin, varies with workforce wages