Q: What is the base datum level for control points in construction building?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Civil Engineering

What is the purpose of a datum level in construction?

Everything has start from somewhere. The datum level is the best place to start


Why stress is a tensor?

Stress is a tensor because it affects the datum plane. When this is affected and it changes, it is then considered a tensor.


What does reduced level mean?

In the context of Civil Engineering, especially land surveying, Reduced Level "RL" refers to reducing (or equating) levels (elevations) to a common datum, which is either a real or imaginary location with a nominated elevation of zero. The most common convenient datum was mean sea level. On small surveys that require the collection of elevation data the datum can be assumed and for practical purposes it simply needs to be far enough below the survey area to avoid negative numbers, thus the starting point of a survey might be nominated to be RL 100.00


What is the work done in raising from the ground a brick wall of uniform thickness of height 2meter and 1000kg?

The work done in raising any object from the ground is independent of the nature of the object (its composition and girth). Hence the data provided ("brick wall of uniform thickness of height 2meter [sic]") is irrelevant. The work that is done in "raising from the ground" any object massing 1000kg is the same as the work done raising any other object massing 1000kg the same distance, for example, five pecks of osmium fashioned into the death mask of Albert Einstein.It should be noted that the expression "to raise a wall" is sometimes used to mean the same thing as "to erect a wall", which clearly not at all the same thing as "to lift a wall". The point of idiotic exercises such as this is the entertainment of idiots and so the fact that terms are employed which are vague and consequently readily misinterpreted is to be expected. When human lives are at stake, for example in the design of bridges, such vagueness can have consequences which most people do not find amusing, for example, the death of the man and woman who conceived one.The answer is 9806.65 Newton-meters per meter raised (a datum not provided). This neglects the lift, which cannot be calculated without knowing the thickness and length of the wall. likewise data not provided. The wall displaces a volume of air (which weighs about one gram per liter), and the work done is less as a result. The effective mass is the mass of the wall, less the mass of the air it displaces. Since the air mass displaced is a function of altitude the solution to the problem requires calculus. Similarly, the gravitational force exerted per kilogram of mass declines as the wall is lifted and a careful calculation of the work performed must take that into account as well. Since both of these quantities vary *within the range specified as 2meters from top to bottom* the problem is quite intricate when fully fleshed unless one makes simplifying assumptions (the force of gravity is the same throughout the wall, etc.) to obtain an approximation rather than the most precise answer possible.


Related questions

A primary datum requires how many points of contact?

According to ASME Y14.5, a primary dimensioning datum requires at least 3 points of contact to establish the datum plane. Two points of contact are required for the secondary datum and 1 point of contact is required for the tertiary datum.


What is the purpose of a datum level in construction?

Everything has start from somewhere. The datum level is the best place to start


What is the definition of 'datum' surfaces?

any level surface from which vertical distances of the points above or below this surface are measured is known as datum


In a building plan what does 1.27 meters AOD mean?

above ordnance datum!


How do you select and establish a suitable datum?

Selecting and establishing a suitable Datum is critical, ensure your datum is at a fixed point. Normally a hole/slot. Holes and slots a normally lasor cut, ensuring they are at an extremely high tolorance already. Then reference the slot or hole to another near by slot or hole. Using these selected points will give you accruate points of measurement/datum.


What is the basis for all horizontal control stations?

horizontal datum note. good luck on NovaNet!


Is datum the plural of data?

Datum is not the plural of data. Datum is singular, and its plural form is data.


How is the reference datum point on aircraft determined?

It is entirely up to the manufacturer of the aircraft. Usually it is an imaginary point forward of the nose of the aircraft and all points aft of that datum have a positive value. This makes weight and balance calculations easier as there are no negative numbers.


What is the horizontal datum used by GPS?

Datum and gps


What is hydrography datum?

Correction: What is hydrographic datum? not "hydrography"


Why is it important to establish a job datum?

The height that is used as the base level from which all other levels are established. Used in construction when when setting out a house. Also called a benchmark.


What is datum in design?

datum is the plane in which we can sketch any thing thing