Want this question answered?
Convert the equation to the standard slope intercept form of y = mx + c, where the value of m is the slope. -5x + 3y = 3 3y = 5x + 3 y = 5/3x + 1 Then the slope is 5/3.
The slope equals 3
Points: (1, 1) and (3, 15) Slope: 7
5x+4y = -3 4y = -5x-3 y = -5/4 x - 3 Slope is -5/4.
5
Yes. A reduction fitting can be used.
I would use 3 inch for that.
A sewer "rod" is normally no larger then 3/8 of an inch diameter BUT a SEWER Cable can be as large as 11\4" even the small sewer rods can have large heads to maintain sewers as large as 36"
If you're talking about a slope: 3 foot run over a 1 inch rise.
4inch or 100mm PVC sewer lines are the best way to go. as amater af fact if you are in Australia they are the legal way to go. 3" or 75mm is only used for stormwater pipes from the gutters.
In Tulsa Oklahoma you can, but i would still use 4 in.
1/8" to 1/4" inch per foot.
By placing the waste 2x the diameter above the opening
A 3 or 4 inch pipe sticking straight up out of the ground? This is the clean out for the sewer line. If sewage is coming out of it, this means the sewer line is clogged or collapsed from there to the main city sewer. If you have a septic tank, the tank is full and needs to be pumped out.
1/4" per ft. is the lowest allowed. 1. Allowed by whom? Not many regulatory authorities specify the minimum slope of a 6" sewer pipe. 2. Why state in inches, typically engineers use a 2.0% or 0.02 / 100' form for the answer. 3. Using Manning's of 0.013 (although most PVC could use a 0.009 or 0.011 n factor, you can achieve the 2 ft/sec typical requirement with a slope of 0.005 or 0.5%, although it was stated to me that 0.0067 or 0.67% is the correct minimun slope to use. I am just trying to find that source which is tough as most authorities do not specify the minimum slope of a 6" pipe.
yes it will. the rating shotguns are chambered for is the maximum size shell you can shoot. i have a 1100 LT chambered for 3 inch and i shoot 2 3/4 inch shells out of it mostly.
A slope of -3 is steeper.