answersLogoWhite

0


Want this question answered?

Be notified when an answer is posted

Add your answer:

Earn +20 pts
Q: What is the pressure rating for 168.3 od schedule 40 pipe?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the pressure rating of XXH pipe?

Its d schedule rating of pressure of pipe...


Why is PVC pipe labeled with schedule?

Pressure rating.


What is the pressure rating of 12 schedule 40 steel pipe?

A pressure rating refers to the qualified operating pressure that is recommended for a component or a system by the manufacturer. The pressure rating of 12 schedule 40 steel pipe is 370 psi.


What is the difference between schedule and class?

schedule is the thickness of the pipe and class is pressure/temperature rating of a fitting or pipe


What is the pressure rating for schedule 80 steel pipe?

The 80 in 80 steel pipe indicates its wall thickness; the higher the number, the thicker the pipe. The pressure rating for a 5" schedule 80 steel pipe at 100 degrees Fahrenheit is 1857 psig.


What is the pressure rating for schedule 80 galvanized pipe?

Is this pipe going to be threaded / Grooved or Welded?


What is the pressure rating of PVC pipe?

It depends on the pipe schedule and diameter... For example. Schedule 40 1 Inch pipe has a minimum burst pressure pressure rating of 1440PSI and an operational PSI of 270. Google can provide a complete chart. Just search "PVC Pipes - Pressure Ratings"


What is the pressure rating for a half inch schedule 40 pipe?

250 PSI WELDED


What is the pressure rating for schedule 80 pipe?

pressure rating up to 40 mm will be 20 bars and higher sizes it will be reduced as PN-15.


Thread schedule 10 pipe?

Because threading thin wall pipe renders the pressure rating ineffective, as it thins the wall to much to be able to withstand the pressure.


What is the pressure rating of schedule 120 black iron pipe?

http://www.ipspipe.com/Documents/Spec/Pipe_pressure_rating.pdf


Pressure rating of pipes?

10,600 PSI if your using Schedule 120