answersLogoWhite

0


Want this question answered?

Be notified when an answer is posted

Add your answer:

Earn +20 pts
Q: What is top soil removal of construction in building works?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Engineering

Find Soil Engineer?

form_title=Find Soil Engineer form_header=8383 Please state the reasons you are needing a soil engineer. (Select all that apply)*= [] "Septic tank ""perk test"" [] Soil analysis for real estate transaction [] To apply for building permit [] Construction recommendations [] Drainage recommendations [] Repair/mitigation recommendations [] Maintenance recommendations [] Check specific soil conditions [] Expert testimony for litigation [] Other" Explain what sort of project this is.*= () "New Construction () Remodel () Addition to existing structure () Building repair () Building inspection () Foundation, slab-on-grade or piling () Pavement () Retaining wall () Drainage system () Septic system () Slope () Other"


What is a possible solution to soil loss due to construction?

piles


Which soil type would be best for building a structure?

Clay


Importance of soil as construction material?

In construction, soil is a significant part of the building process. If performed improperly, settlement of the soil could occur and result in unnecessary maintenance costs or structure failure. Almost all types of building sites and construction projects utilize mechanical compaction techniques. There are five principle reasons to compact soil: - Increases load-bearing capacity - Prevents soil settlement and frost damage - Provides stability - Reduces water seepage, swelling and contraction - Reduces settling of soil There are five basic types of soil (gravel, sand, silt, clay, and organic), and the dirt in a given location is generally some combination of all or most of these types. The soil from a new building site is tested to determine its suitability. Organic material must be removed from the soil and, if necessary, a different type of soil can be trucked in and mixed with the existing dirt to create a blend that will work. Cement may be added to the soil to increase both its strength and its resistance to moisture-usually at about one-fourth the ratio that would be used to make concrete. A variety of tests are conducted to determine the suitability of the local soil for construction material. For example, a particle determination test reveals the relative proportions of sand and silt in the sample. A compaction test is performed by forming a ball of mud and dropping it from a height of 3 ft (1 m); the degree to which the ball disintegrates on impact reveals its usefulness for building. Other, more precise, tests can be performed at a geotechnical laboratory. If the native soil is unsuitable or inadequate for building, it can be blended with or replaced by soil from another source. The ability of soils and rocks to hold and transmit water varies, and the depth to groundwater varies in different geological settings. Physical properties of soils and rocks, such as degree of consolidation, cementation, and hardness, determine drilling methods and the potential for groundwater production. When drilling, consolidated rock is harder to penetrate but is more stable than unconsolidated rock. Well drillers usually use a down-hole air hammer on consolidated rock with no well casing for support. Drillers must support holes in unconsolidated rock to avoid cave-ins. Wells in unconsolidated rock frequently yield more water at a shallower depth than wells in consolidated rock.


What are the fundamental requirements for building a foundation?

Load bearing capacity of the soil

Related questions

Why remove top soil in building and construction?

Because It Is Important


What has the author Edwin Leroy Hansen written?

Edwin Leroy Hansen has written: 'The Suitability of stabilized soil for building construction' -- subject- s -: Building materials, Soil mechanics


Why does construction contributes to soil erosion?

it removes vegetation from the building site. Trust me it's the RIGHT answer.


Do you need a soil boring to test your soils before building a house foundation?

Yes, the related cost to getting a soil boring test is pretty minimal compared to the possible problems that could arise during construction and compared to the overall construction costs of your house/building.


Why soil survey should be carried out before construction takes place?

The surveys should take place before the construction to know that whether the soil is hard enough or stable enough to take the load of construction. This survey is important so that the house or the building do not sink in.


What is the removal of nutreints from a soil by a liquid?

Removal of nutrients from soil is called leaching


How herbivores are responsible for the removal of soil?

sometimes herbivores are responsible for the removal of soil .how?


What does a MAP engineer do?

A map engineer determines the topographic map of construction site so the volume of soil that should be carried to out site or be brought from out site can be computed. Moreover, he determines borders of the building and important points in the building with the start of construction.


How soil as a natural body differs from soil a material used in construction?

the soil used in construction has been handled by man and the natural soil forms naturally as it is


What is soil-building process?

building up soil


What effect does construction of building and roads have on percolation through the soil. Hence what effect does it have on water table?

that we can't tell .but the level of water table decreases


What types of soil are used for construction of a house?

sandy soil is used for making blocks which are used in construction of a house