answersLogoWhite

0

What was the schileffen plan?

Updated: 9/17/2023
User Avatar

Wiki User

7y ago

Best Answer

Actually, it is spelled "Schlieffen", after the German Count Alfred von Schlieffen.

See the Wikipedia article in the Related links section for more details.

In summary, it was German's military strategy dating from around 1900 to win a 2-Front war, supposing that it had to fight both France and Russia at the same time.

The main ideas of the plan were:

  1. Taking advantage of Russia's slow mobilization speed, fight the French first.
  2. Using weak forces on the Eastern Front (with Russia), fight minor delaying actions.
  3. Tie down the majority of French forces (and maintain French strategic attention) by conducting minor attacks in the Alsace-Lorraine. In essence, feint the French in the East.
  4. Sweep through the Low Countries (Holland, Belgium, Luxembourg) with the main arm of the German army, driving down along the Western coast of France, an envelope Paris from the west. Additionally, cause the main French forces (East and North of Paris) to be encircled.
  5. France would then surrender.
  6. Ship all forces back to the German Eastern front, and fight the Russians.

It was a bold plan. Some say too bold. In any case, it was the basis for Germany's French campaigns in both World War One and World Word Two.

User Avatar

Wiki User

7y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What was the schileffen plan?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What was mobilization in Europe in 1914?

the october of assemblting and making both troops supplies ready for war. with the outbreak of war, both allied central powers mobilized massive messure armies. The plan was created by a German general named alfred won Schileffen in 1905. Germany knew it traced as sized war so son created a war plan for this. Germany assumedit would take Russia along time to mobillized the start of war, so they planned on attacking France first and reach Paris in 6 weeks. After searching France they would turn their attention to Russia.


What words start with the prefix plan?

plan-arian plan-less plan-tain plan-ter plan-isphere


How do you say the awesome plan in German?

the awesome plan - der tolle Plan an awesome plan - ein toller Plan awesome plan - toller Plan


What is the meaning of sub-plan?

A sub-plan is a component or subsection of a larger plan. It outlines specific details or actions related to a particular aspect of the overall plan. Sub-plans are often created to address a specific area in more detail or to assign responsibilities to different individuals or teams.


What was the single plan?

A single plan is a plan


What is Rico's plan that he is hiding?

The plan is to remember his plan and tell other of his plan


Is budget a single use plan standing plan or strategic plan?

It is a strategic plan


How do you transfer a business plan to an action plan?

How to transfer business plan to an action plan


Is a Master plan a strategic plan?

Not exactly…a master plan is the main plan to follow.


What is the future tense of the verb plan?

The future tense of the verb "plan" is "will plan".


What is the difference between operational plan and action plan?

An operational plan is a permanence plan or a repeated work but an action plan is a plan used to take action on a new problem.


What battle represented this plan of lee?

Define which plan "this plan" is.