Q: Why stiffener is providing below the pile cap?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the minimum required thickness for pile cap?

Pile cap should no less than 1.5 times the dia of pile


What is the allowable eccentricity of pile?

Pile eccentricity will allowable up to maximum 75mm. Above that we can proceed pile cap works by increasing the size of pile cap.


Method of statement of pile cap?

A pile cap is a part of a cement or concrete formation. The method statement shows how the pile caps should be made.


How do you measure pile cap formwork?

It is very simple. Just calculate the perimeter of the pile cap using the pile cap plan and just multiply this perimeter by the depth of the pile cap which can be worked from the sectional drawings or sometimes it is specified in the plan drawings itself. Eventually you get the formworks in sqm.


What is pile cap formwork?

Pile cap formwork is the formwork built to mold the concrete that binding together the pile or group of piles and the structure supported by the piles such as structure's foundation or column.


What is allowable eccentricity for pile?

Concrete piles cannot be driven at precise intended location; This is true for bored piles also. For practical reasons various country design codes restrict the permissible deviation. In Indian code this value is specified as 75 mm. This plays important role in pile-cap design. The deviation smaller than this will never be reported. So pile cap sizing needs to be based on the worst possible direction deviation. The pile eccentricity is one of the important aspects in pile cap shear strength calculation as well as pile cap reinforcement calculation.


How do you stop the smell of a creosote piling?

Sleeve over the pile with a slightly larger composite piling(Pearson pile) , top with PVC cap.


What is superstructure and substructure for bridges?

Items of Work which are below the Bearing viz pile cap, pier, pier cap are consdered as sub structure whereas the items above the Bearing viz girder and deck slab are super structure. Ansered by Rajiv Shah


What is cut-off level in pile foundation?

Piles are used in foundations to give a better base for structures. The appropriate pile cut-off level is commonly around 75mm above the underneath of the pile cap.


What is cut off level in pile foundation?

Piles are used in foundations to give a better base for structures. The appropriate pile cut-off level is commonly around 75mm above the underneath of the pile cap.


What is the tendon below the knee cap called?

answer plz


Can you list types of foundation in building?

Matt or Raft Foundation Combined Footings Pile Cap Foundations Isolated Foundations Continous Foundation