13.5 hours labor is standard time.
On top of the cam sensor synchronizer which is sticking out of the top of the timing cover on the front of the engine.
Align the timing marks on the camshaft gears to the notches on the camshaft cover, using the intake gear mark for the intake gear and the exhaust gear mark for the exhaust gear. 38. Align the mark on the crankshaft gear with the notch at the bottom of the rear timing belt cover.
Under the coil pack on the left hand side (pass. side)of the moter
Oh, isn't that just a happy little question! If you have 38 tiles that are each 12x12 inches, they will cover a total of 38 square feet. You see, each tile covers 1 square foot, so when you multiply 38 tiles by 1 square foot, you get 38 square feet. Just imagine all the beautiful patterns and designs you could create with those tiles!
Luckily these window motors are widely available from any auto parts supply retailer.RockAuto.com and Autozone have motors ranging from $38-100.Be sure to review the "Related Questions" for much more about Windstar power windows
start with 38 tiles.
Get a timing light, they sell them in an auto parts store about 30 bucks, shine it on the surpentine belt, and you should be able to see the mark.
It will take 0.54 hour to cover 38 miles going by 70 miles per hour.
You will have to call Colt. SN data published does not cover this sn.
600-650 USD depending on condition.
As a fan of Dame Shirley's for 38 years I can confirm that yes, she did indeed!
AnswerHow to replace starter for 1996 Buick Regal #.8 Liter 6cyl