Best Answer

the standard allowed minutes for the 5 pkt jeans is 12 to 17 minutes based on the skill of the operators and the types of specialized machines used Dhan

User Avatar

Wiki User

14y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is the standard allowed minutes for the basic denim trouser i.e how much time a skilled sewing worker in general takes to make a basic denim trouser in a factory?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the standard allowed minutes for the basic woven shirt I mean how much time a skilled sewing worker in general takes to make a basic woven shirt in a factory?

12 MINUTES......


What is the standard allowed minutes for the knit polo shirt?

A polo is about 6.5 minutes at 85% efficiency.


What is difference between standard allowed minutes and standard minute value?

Most of the time they are used alternatively as many people even the expert one's don't know the difference. Standard Allowed Minutes means Time (in minutes) that is assigned to a specific operation after doing time study or using PDMTS. Standard Minute Value means the Cost Factor that is multiplied with SAM to get the Cost/Minute of the operation. For Example: Operation Name: Registration of Customer Complaint SAM: 1.3 Minutes SMV: 0.10 Cents Cost/Minute: 13 Cents


What is the formula for Standard allowed minute calculation in apparel industry?

Standard Allowed Time is computed from Live Time Study or Standard Data Analysis (SPD) Standard Allowed Minutes (SAMs) is calculated as follows: Total Raw Cycle Time / # valid Operation Cycles = Average Time (minutes) Average Time x Leveling Factor = Normal Time (minutes) Normal Time + P. F. & D. = Standard Allowed Time (minutes) Cycle time is the time it takes for one complete unit for that operation Operation cycles are valid if their value is within 1 standard deviation of the Average Time. Leveling Factor is determined by the engineer for the worker being observed (not calculated when using Standard Data Analysis P. F. & D. is Personal Fatigue and Delay a percentage added to compensate for normal working conditions and the specific operation. Personal is typical at 5% added to the Normal Time.


What is standard allowed minutes in garments?

Standard Allowed Minutes is the standard time (minutes) allocated for an operation (single operation of a garment) or a garment (sum of all operations in a garment). It is based on either in line time study & calculation or it is calculated through PDMTS. Its abbreviated form is "SAM" SAM is the key to determine target of various operations in a garment and hence for a garment. It is also used in the calculation of conversion cost. Waqas Dilawar Induatrial Engineering Department Nishat Apparel Limited, Lahore, Pakistan.


How long is the Willy Wonka and the Chocolate Factory movie exactly?

"Willy Wonka and the Chocolate Factory" (1971) = I hour & 40 minutes .


What is the conversion of 8 standard minutes to metric time?

The standard unit for measuring time is a second so 8 minutes = 480 seconds.


How many minutes in a standard hour?

60 minutes in an hour.


What is the standard abbreviation for minutes?

The standard abbreviation for minute/s is min - no 'period' and no 's' - e.g. minute = min, 2 minutes = 2 min, etc.


How long is an acceptance speech allowed to be for the Oscars?

five minutes


How long were the parents allowed to visit their children for in the workhouses?

Parents were only allowed to visit their children a few minutes.


How many standard meridian are there in russia?

37 degree 37 minutes