use secondary injection test with pilots connected.

User Avatar

Wiki User

12y ago

What else can I help you with?

Related Questions

How solkor relay works explain?

It work like a master slave flip flop if its not a logic 1 then its a 0.


Who are the Service providers for Relay testing & Commissioning?

Power Advantage is the best service providers when it comes to Relay Testing & Commissioning.


How can fair testing be done?

the fair testing will done if you want to done


What are the type of pre commissioning testings done before commissioning a electrical substation of voltage rating 110 kilovolt?

Depending on the equipment required for the substation,some of the tests are as follows: meggering,hi-pot testing,continuity checks,c.t. testing,relay testing,ngr testing, capacitance bridge test's on transformers.


What is rigorous software testing?

After we are done with coding we do testing . Rigorous means extreme so we can say rigorous testing is one which is done in extreme conditions.


Which testing is done to validate the entire product?

system testing


How can someone tell if an ac relay fuse is blown?

A relay does not have a fuse. The circuit for the particular relay is fused. You can tell if the fuse is blown by testing it with an ohm meter.


What causes your radio to turn off when the lights are turned on?

It's a relay. Which one it depends... I would start from testing headlights relay.


Where is BRCA testing done?

It's usually done in hospitals.


What is the difference between block box and white box testing?

White box testing or unit testing: To do white box testing, knowledge of internal logic code is required. It is mostly done by developers.Black box testing: The functionality of an application is tested; logic code is not required. This testing is done by testers.Block box or system testing: Testing the application without knowledge of underline code of the application. it is done by the testers.


Can notary testing be done in one day?

Notary testing can indeed be done in one day. You can find more information at www.notarytrainer.com.


Difference between pre testing and post testing?

Pre-testing is done before and post-testing is done after. They are typically done before and after a class to measure how much was learned. They can also be done to measure the effectiveness of certain training or therapy.