10 bags will give you 6'2/3", seven bags will give you 11 bags will give you 7'1/3". Each bag is 2/3 cu feet.
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
To determine how many pounds of concrete are needed to cover 400 square feet, you first need to know the desired thickness of the concrete slab. For example, if you want a thickness of 4 inches (0.33 feet), you would calculate the volume in cubic feet: 400 sq ft x 0.33 ft = 132 cubic feet. Since one cubic foot of concrete weighs approximately 150 pounds, you would need about 19,800 pounds of concrete (132 cubic feet x 150 lbs/cubic foot).
To calculate the amount of concrete needed to cover 3,000 square feet at a thickness of 6 inches, first convert the thickness from inches to feet: 6 inches is 0.5 feet. Then, multiply the area by the thickness: 3,000 sq ft × 0.5 ft = 1,500 cubic feet of concrete. To convert cubic feet to cubic yards (since concrete is typically measured in cubic yards), divide by 27: 1,500 cu ft ÷ 27 = approximately 55.56 cubic yards. Therefore, you will need about 56 cubic yards of concrete.
To calculate the number of 80-pound bags of concrete needed for a 10 x 10 x 4-foot slab, first determine the volume in cubic feet: 10 x 10 x 4 = 400 cubic feet. Since a standard 80-pound bag of concrete yields about 0.6 cubic feet, divide the total volume by the yield per bag: 400 ÷ 0.6 ≈ 667 bags. Therefore, you would need approximately 667 bags of 80-pound concrete to complete the slab.
To calculate the amount of concrete needed to cover an area of 22 feet by 26 feet at a depth of 4 inches, first convert the depth from inches to feet: 4 inches is approximately 0.33 feet. The volume in cubic feet is then calculated as 22 ft × 26 ft × 0.33 ft, which equals about 189.24 cubic feet. Therefore, you would need approximately 189.24 cubic feet of concrete to cover the specified area.
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
An 80 pound bag of premix concrete will make .6 cubic feet of cured concrete. There are 27 cubic feet in a cubic meter, so it would take 45 80 pound bags to make one cubic meter.
60 pound of concrete bag makes 1/2 cubic foot of concrete
An 80-pound bag of premixed cement = .667 cubic feet, or 2/3 of a cubic foot, of concrete. A 60-pound bag of premixed cement = .5 cubic feet, or 1/2 of a cubic foot, of concrete.
An 80-pound bag of sacked concrete typically yields about 0.6 cubic feet of concrete. A standard 12-inch concrete block has a volume of approximately 0.5 cubic feet. Therefore, an 80-pound bag can fill about 1 to 1.2 blocks, depending on the specific dimensions and any extra material needed for mortar or adjustments.
To determine how many 80-pound bags of concrete are needed to fill a 55-gallon drum, first calculate the volume of the drum. A 55-gallon drum holds about 7.4 cubic feet (since 1 gallon is approximately 0.133 cubic feet). An 80-pound bag of concrete typically yields about 0.6 cubic feet. Therefore, you would need approximately 12 to 13 bags of concrete to fill the drum.
The term "yards" of concrete means cubic yards.
A typical 80-pound bag of concrete mix yields about 0.6 cubic feet of concrete. A 3-yard mixer has a capacity of 81 cubic feet (3 cubic yards). To fill the mixer, you would need approximately 135 bags of 80-pound concrete mix, since 81 cubic feet divided by 0.6 cubic feet per bag equals about 135 bags.
100 mmm = 0.100 meter 28 x .1 = 2.8 cubic meters
To calculate the amount of concrete needed to cover 3,000 square feet at a thickness of 6 inches, first convert the thickness from inches to feet: 6 inches is 0.5 feet. Then, multiply the area by the thickness: 3,000 sq ft × 0.5 ft = 1,500 cubic feet of concrete. To convert cubic feet to cubic yards (since concrete is typically measured in cubic yards), divide by 27: 1,500 cu ft ÷ 27 = approximately 55.56 cubic yards. Therefore, you will need about 56 cubic yards of concrete.
Each 60 pounds bag of ready mix concrete will make .45 cubic foot of concrete. There are 27 cubic feet in a cubic yard. You will need 60 bags of 60 pound premixed concrete to make 1 cubic yard.
To calculate the amount of concrete needed to cover an area of 22 feet by 26 feet at a depth of 4 inches, first convert the depth from inches to feet: 4 inches is approximately 0.33 feet. The volume in cubic feet is then calculated as 22 ft × 26 ft × 0.33 ft, which equals about 189.24 cubic feet. Therefore, you would need approximately 189.24 cubic feet of concrete to cover the specified area.