4.4 Bags
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
25
typically one pallet, i believe theres 42 80lb bags on a pallet.
To determine how many bags of cement are needed for 11 yards of concrete, you first need to know the concrete mix ratio. A common mix is 1:2:3 (cement:sand:gravel). For a standard 80-pound bag of cement, it typically yields about 0.6 cubic feet of concrete. Since there are 27 cubic feet in a yard, 11 yards equals 297 cubic feet. Using a standard mix, approximately 7 to 8 bags of cement would be needed for this volume, depending on the specific mix and design requirements.
depends on bad size and product, the calculations for what you are asking are on the bags back and product websites
15 milligrams
For M10 (1:3:6) Grade of concrete cement bag consumed = 4.4 bags/cum M15(1:2:4) Grade of concrete cement bag consumed = 6.6 bag/cum M20(1:1.5:3) Grade of concrete cement bag consumed = 8.2 bag/cum
10.94 bags
8.4 beg (per beg 50Kg.) (420kg cement)
4.4 bags
To determine how many 50 kg cement bags are required for 1 cubic meter of Grade 30 concrete, we need to break down the mix ratio and calculate the cement content based on that. Grade 30 Concrete Mix Ratio Grade 30 concrete typically has a mix ratio of 1:2:3 (Cement: Sand: Aggregate) by volume. This means: 1 part cement 2 parts sand 3 parts aggregate (gravel) However, the actual proportion of cement required can vary slightly depending on the specific mix design used by a contractor or engineer. For standard Grade 30 concrete, the cement content is typically around 350 to 400 kg per cubic meter. Since each cement bag weighs 50 kg, the number of bags required for 1 cubic meter of Grade 30 concrete would be: Number of bags = 350 kg / 50 kg = 7 bags
7 cement bags per 1 cubic meter of concrete......
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
2million
25
According to Blue Circle it takes 108 bags of concrete to get a cubic meter
10