What is variation order in electrical?

variation order is the extra work done outside your original contract. you should have a variation order form filled and the clients authorization. all the records of material and labour charge should be recorded so that the client can be billed. an example of variation order is say if your contract says you to change the light bulb but found out that there is a wrong cable used and needs to rewire with new cable then u need to inform client and need their authorization in order to rewire them.


Differences between organisms of the same species are known as?

Homologous structures. ps go to who's the cutest.com and click on the pie button


Is mango leaf a parallel variation?

No, mango leaf is not considered a parallel variation. Parallel variation refers to easy and reversible changes within a species or population, while mango leaf characteristics are part of the natural variation within the species.


What are the three types of variation?

The three types of variation are genetic variation, environmental variation, and genotype-environment interaction. Genetic variation refers to differences in DNA sequences among individuals, while environmental variation is differences in traits caused by external factors. Genotype-environment interaction occurs when the effect of genes on traits depends on the environment.


What is difference between somaclonal and gemetoclonal variation?

Somaclonal variation occurs when plants regenerated from somatic cells show genetic variation due to tissue culture processes, while gametoclonal variation arises from genetic changes in gametes. Somaclonal variation is more common in tissue culture-based regeneration systems, while gametoclonal variation is a result of natural processes during meiosis and gamete formation.

Related Questions

Who can confirm a variation order to a contract?

The superintendent of the contract.


What is variation clause?

A variation clause is a clause in a contract that allows for changes to be made to the terms and conditions of the agreement after it has been signed. It gives both parties the flexibility to adjust the contract if circumstances change or new developments arise.


Describe and explain the term variation clause as it applies to a contract and provide at least 3 examples variation clauses?

Variation Clause in a contract would allow a party to vary the terms stated in the contract, with no need for fresh consideration. Thus, it is easier for changes to contracts to be made. That said, the variation must be within reasonable limits. An example would be of the Variation Clause found in an employment contract, where the employer will be able to vary the salary of an employee. Another common example would be a Price Variation Clause that allows for fluctuation in prices of goods sold or services rendered. Another common example I can think of is with regards to the interest rates that banks provide for loans and probably savings accounts, depending on the economic environment. >> All the above are answered based on my general knowledge and is not to be taken as correct interpretations of variation clauses. I do not have any credentials.


What is difference between variation and provisional sum?

Provisional sum is an amount quoted for an item in a tender document where all of the design information is not fully specified. The provisional sum should be as accurate as possible with the information to hand A variation is an item within a construction project that was not originally specified in the contract tender document and so is a 'variation to contract'.


What is the difference between an attachment to a contract and an addendum to a contract?

Addendum's are often added to contracts in order to add or make changes to the contract. Attachments on a contract are often found in e-mails.


In contract costing profit can be recognised only when the contract is completed?

In contract costing, the profit is only guaranteed when the actual contract is completed because the prices keep changing. There is usually a slight variation between projected profit and the actual figures.


What is variation order in electrical?

variation order is the extra work done outside your original contract. you should have a variation order form filled and the clients authorization. all the records of material and labour charge should be recorded so that the client can be billed. an example of variation order is say if your contract says you to change the light bulb but found out that there is a wrong cable used and needs to rewire with new cable then u need to inform client and need their authorization in order to rewire them.


What is Variation in construction?

A variation in a construction contract is a change from what is currently contracted to be built, supplied or fitted to a different build, supply or fit. Variations are written instructions from the client to a contractor or from a main contractor to a sub contractor. The instruction will set out the details of the change so that all parties are agreed on the new construction details. Typically, a variation is used to clarify a detail that could not be fully defined at the start of the contract - Paints, wall coverings, carpets are examples of such details that are often left to the end of the contract to decide. They can be used when unexpected issues arise during the contract. They are often used simply because the client changes his mind during a contract. The final contract is often modified by hundreds or even thousands of variations that each reflect a change in the way the building contract is to run.


What to do when a contract has a variation clause and an extension of time clause that is unworkable?

describe and explain the term, "variation clause" as it applies to a contract and provide at least 3 examples variation clauses.The question is not clear, since the term "unworkable" extension of time clause is rather vague. The PVC purports to protect the interests of the vendor/contractor and at the same time would not allow the vendor/contractor to make undue profits from the clause. Hence, it is customary to specify that if an extension of time is granted to the vendor/contractor, (say due to the prevalence of a force majeure condition), no price variation would apply to the extended time. This condition would be part of the Contract Amendment documenting the extension of time.


What is the difference between variation order and site instruction?

A variation order is a change in the scope of work or contract terms agreed upon by both parties, usually leading to an adjustment in cost or time. A site instruction is a directive given by the client or contractor to change how work is carried out on site, but it may not always result in a contractual change or adjustment. Essentially, a variation order impacts the contract, while a site instruction affects how work is executed on site.


What is the difference between variation order and extra work in construction?

A variation order is when there is a decrease or increase in quantities in your original scope of work. While an extra work is a new item of work introduced which shall be added into your original scope and will be binded in your contract.


What is a price variation clause in law?

A price variation clause in law allows contract parties to adjust the price of goods or services based on specific factors such as inflation, currency fluctuations, or changes in market conditions. This clause helps to protect both parties from unforeseen cost increases during the term of the contract.