answersLogoWhite

0

photogrammetry is a remote seasoning technology which determine the geometrical property of object are determine from a photographic image.i.e X,Y,Z coordinate.

User Avatar

Wiki User

14y ago

What else can I help you with?

Continue Learning about Civil Engineering

What are the difficulties encountered that are challenges to petronas twin tower project?

no you can not punk!!!


What is the relationship between engineer contractor and clients?

The relationship between an engineer contractor and clients is typically collaborative and contractual. The engineer contractor is responsible for executing the technical aspects of a project, ensuring it meets specifications and quality standards, while clients provide project requirements, funding, and oversight. Effective communication and trust are essential for addressing challenges and ensuring that the project is completed on time and within budget. Ultimately, both parties aim for successful project outcomes that satisfy the client's needs.


What is a concrete question meaning?

A concrete question is one that is specific, clear, and focused, allowing for precise answers. It typically addresses a particular issue or topic and avoids ambiguity. For example, instead of asking, "What do you think about the project?" a concrete question would be, "What are the potential challenges we may face in the project's implementation?" This specificity helps facilitate meaningful discussion and responses.


What are the advantages of the architect over the project manager in project management?

This question requires an elaborate answer, here's an excellent article on the differences (and the advantages) between the project architect and the project manager: http://www.pmhut.com/project-architect-vs-project-manager


What are some special challenges that the banpo brodge architects and engineers faced?

The architects and engineers of the Banpo Bridge faced several challenges, including the need to integrate a unique double-deck design that accommodates both vehicles and a water fountain system. They had to ensure structural integrity while managing the bridge's substantial weight and dynamic loads. Additionally, the project required innovative solutions to handle the complexities of the fountain's water distribution and lighting, all while adhering to strict safety regulations and environmental considerations. The project also demanded collaboration across various disciplines to achieve the desired aesthetic and functional outcomes.

Related Questions

Where is the Nolumbeka Project Inc in Greenfield Massachusetts located?

The address of the Nolumbeka Project Inc is: 88 Columbus Avenue, Greenfield, MA 01301-1511


What are the release dates for Untitled Greenfield Seigel Castro Comedy Project - 2006 TV SUSPENDED?

Untitled Greenfield Seigel Castro Comedy Project - 2006 TV SUSPENDED was released on: USA: 2006


What is the Difference between greenfield project and brownfield project?

What is the Difference Between a Brownfield Project and a Greenfield Project? The main difference between a greenfield project and a brownfield project lies in whether the project is built on a new site or an existing facility. A greenfield project involves developing a manufacturing plant or industrial facility from scratch on undeveloped land. It offers complete flexibility in plant layout, technology selection, and future expansion but generally requires higher investment, longer project timelines, and more regulatory approvals. A brownfield project, on the other hand, focuses on expanding, upgrading, or redeveloping an existing manufacturing facility. Since the basic infrastructure is already in place, brownfield projects typically require lower capital investment, can be completed faster, and minimize disruption to existing operations. In summary: Choose a greenfield project when you need a completely new manufacturing facility with maximum design flexibility. Choose a brownfield project when you want to expand or modernize an existing plant while reducing costs and project timelines. If you'd like to explore practical examples of Greenfield and Brownfield projects, including project requirements, engineering services, regulatory approvals, implementation processes, and best practices, IMARC Engineering has published detailed guides on both topics. Simply search for "IMARC Engineering Greenfield Plant Setup" or "IMARC Engineering Brownfield Plant Setup" on Google to find these resources and gain a deeper understanding of each project approach.


What are the advantages and disadvantages of greenfield investment?

Greenfield investment can be a good thing if the project invested in ends up really taking off. However, it also has the potential to lose a lot of money because the investment is in an unknown enterprise.


How do you say I am from Greenfield in Spanish?

I am from Greenfield = Soy de Greenfield


Where is the Greenfield Public Library in Greenfield located?

The address of the Greenfield Public Library is: 202 So. First St, Greenfield, 50849 0328


Where is the Greenfield Branch Library in Greenfield located?

The address of the Greenfield Branch Library is: 315 El Camino Real, Greenfield, 93927 5131


Where is the Greenfield Historical Society in Greenfield Ohio located?

The address of the Greenfield Historical Society is: Po Box 217, Greenfield, OH 45123-0217


What is the birth name of Steve Greenfield?

Steve Greenfield's birth name is Stephen Matthew Greenfield.


What is a greenfield airport?

Greenfield Airport means a new airport which is built from scratch in a new location because the existing airport is unable to meet the projected requirements of traffic.The word greenfield originates from software engineering, meaning a project which lacks any constraints imposed by prior work. Those projects which are modified or upgraded from existing facilities are called brownfield projects.


A greenfield Airport?

Greenfield Airport means a new airport which is built from scratch in a new location because the existing airport is unable to meet the projected requirements of traffic.The word greenfield originates from software engineering, meaning a project which lacks any constraints imposed by prior work. Those projects which are modified or upgraded from existing facilities are called brownfield projects.


What is the phone number of the Greenfield Branch in Greenfield?

The phone number of the Greenfield Branch is: 937-981-3772.