It depends on the usage of the concrete. For footings, you would need 5 bags of cement. For sidewalks, etc. you would need 6 bags. Generally, if you know the usage it's for, you can contact a local ready-mix plant and they can tell you exactly.
4.4 bags
To find out how many 94-pound bags of Portland cement are needed for a yard of sand, you typically use a 1:2:3 mix ratio (cement, sand, gravel) for concrete. Since a yard of sand weighs about 1,600 pounds, you'll need approximately 533 pounds of cement for that mix. Given that each bag of Portland cement weighs 94 pounds, you would need about 6 bags (533 ÷ 94 ≈ 5.67). Therefore, you would need 6 bags of Portland cement for a yard of sand.
well concrete mix is a 1/3 gravel , 1/3 sand and 1/3 portland cement . I hope this helps.
10
10.94 bags
25
Depending on the use of the concrete, between 5-6 bags.
4.4 bags
7 cement bags per 1 cubic meter of concrete......
well concrete mix is a 1/3 gravel , 1/3 sand and 1/3 portland cement . I hope this helps.
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
4.4 Bags
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
2million
That will depend on the thickness (depth) of the concrete.
15 milligrams
10