It depends on the usage of the concrete. For footings, you would need 5 bags of cement. For sidewalks, etc. you would need 6 bags. Generally, if you know the usage it's for, you can contact a local ready-mix plant and they can tell you exactly.
To determine how many bags of Portland cement are needed for a yard of concrete, you first need to know that a typical concrete mix consists of about 1 part cement, 2 parts sand, and 3 parts gravel by volume. A standard 94-pound bag of Portland cement yields approximately 0.5 cubic feet when mixed. Therefore, you'll need around 5 to 6 bags of Portland cement to make one yard (27 cubic feet) of concrete, depending on the specific mix design used.
To find out how many 94-pound bags of Portland cement are needed for a yard of sand, you typically use a 1:2:3 mix ratio (cement, sand, gravel) for concrete. Since a yard of sand weighs about 1,600 pounds, you'll need approximately 533 pounds of cement for that mix. Given that each bag of Portland cement weighs 94 pounds, you would need about 6 bags (533 ÷ 94 ≈ 5.67). Therefore, you would need 6 bags of Portland cement for a yard of sand.
4.4 bags
well concrete mix is a 1/3 gravel , 1/3 sand and 1/3 portland cement . I hope this helps.
10
25
To determine how many bags of Portland cement are needed for a yard of concrete, you first need to know that a typical concrete mix consists of about 1 part cement, 2 parts sand, and 3 parts gravel by volume. A standard 94-pound bag of Portland cement yields approximately 0.5 cubic feet when mixed. Therefore, you'll need around 5 to 6 bags of Portland cement to make one yard (27 cubic feet) of concrete, depending on the specific mix design used.
Depending on the use of the concrete, between 5-6 bags.
To find out how many 94-pound bags of Portland cement are needed for a yard of sand, you typically use a 1:2:3 mix ratio (cement, sand, gravel) for concrete. Since a yard of sand weighs about 1,600 pounds, you'll need approximately 533 pounds of cement for that mix. Given that each bag of Portland cement weighs 94 pounds, you would need about 6 bags (533 ÷ 94 ≈ 5.67). Therefore, you would need 6 bags of Portland cement for a yard of sand.
4.4 bags
7 cement bags per 1 cubic meter of concrete......
well concrete mix is a 1/3 gravel , 1/3 sand and 1/3 portland cement . I hope this helps.
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
4.4 Bags
To mix 1 cubic yard of concrete, you typically need about 5 to 6 bags of Portland cement, depending on the specific mix design and the desired strength of the concrete. A standard 94-pound bag of Portland cement yields roughly 0.5 cubic feet when mixed. Therefore, for 1 cubic yard (27 cubic feet), approximately 5.7 bags would be required. Always check the specific mix requirements for your project, as variations can occur.
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
2million