That depends on the concrete, as well as weather conditions, and the load the concrete would be subjected to. Concrete gains strength over time and the usual benchmarks are 7 days, and 28 days. At 28 days concrete has usually cured to nearly its maximum strength. For a concrete footing in a residential environment say a deck or home the concrete will usually cure for a minimum of three days before the formwork is removed and the rest of the structure is built. For a commercial or civil project the curing is subject to the engineers discretion.
The soffit formwork of a reinforced cement concrete (RCC) beam can typically be removed after 14 to 21 days of curing, depending on the concrete mix and environmental conditions. It is crucial to ensure that the concrete has gained sufficient strength, usually around 70% of its design strength, before removal. However, for specific projects, it's best to refer to the structural engineer's recommendations or local building codes.
Q1
1 archybald and sealyer
the strength that it has gained is the main thing, but usually 5 to 7 days as a rough guide.
According to the related link below; the required amount to cover 1 square yard with 4 inches of concrete is 6.6 60 pounds bags.
It starts curing the second they put water in it.
The number of days required for lifting a precast unit from the bed typically depends on several factors, including the curing time of the concrete, the type of precast unit, and environmental conditions. Generally, precast concrete elements may require a minimum of 3 to 7 days for sufficient curing before lifting, but full strength may take longer. It's essential to consult project specifications and guidelines to determine the exact timeframe for each specific case.
That would depend on the kind of concrete. Normally longer is better. The slower the curing process the stronger the concrete.
24 days
The soffit formwork of a reinforced cement concrete (RCC) beam can typically be removed after 14 to 21 days of curing, depending on the concrete mix and environmental conditions. It is crucial to ensure that the concrete has gained sufficient strength, usually around 70% of its design strength, before removal. However, for specific projects, it's best to refer to the structural engineer's recommendations or local building codes.
Q1
It depends on the size of the concrete blocks
Try Goof Off , it removes many odd substances and will not harm auto finishes.
1 archybald and sealyer
50/3 cubic yds of concrete
12.5 Blocks required for 1 m2
14.814813 m3