answersLogoWhite

0

To prepare 16m³ of concrete, a common mix ratio is 1:2:3 (cement: sand: gravel). For this ratio, you'll need approximately 480 kg of cement, 960 kg of sand, and 1,440 kg of gravel. If you're using a standard 25 kg bag of cement, this would be about 19 bags. Additionally, the amount of ballast will depend on the specific mix design, but it typically involves using a combination of the sand and gravel.

User Avatar

AnswerBot

2mo ago

What else can I help you with?

Related Questions

How much does 1 yard of concret weigh?

This can vary do to the mixture of sand, stone, cement... but an approximate average would be 3000 lbs


How much cement to add to one ton of ballast?

The amount of cement to add to one ton of ballast depends on the desired concrete mix ratio. A common mix ratio for general-purpose concrete is 1 part cement to 4 parts ballast, which would mean adding approximately 0.25 tons (or 250 kg) of cement to one ton of ballast. However, specific project requirements may necessitate adjustments to this ratio. Always consult relevant guidelines or specifications for the exact mix needed.


How much cement to 1 ton of ballast?

The typical mix ratio for concrete is often around 1 part cement to 6 parts ballast (aggregate), by volume. This means that for 1 ton of ballast, you would generally use about 0.17 tons (or approximately 170 kg) of cement. However, the exact amount can vary based on the desired strength and application of the concrete mix. Always consult specific mix design guidelines for your project.


How much ballast and cement for footing 10m x 1m deep?

To calculate the amount of ballast and cement needed for a footing measuring 10m x 1m deep, you first determine the volume of the footing, which is 10 cubic meters (10m x 1m x 1m). A typical concrete mix ratio is 1 part cement, 2 parts sand, and 4 parts ballast. For a standard mix, you would need approximately 1.5 cubic meters of cement, 3 cubic meters of sand, and 6 cubic meters of ballast, but this can vary based on the specific mix design and strength requirements. Always consult with a structural engineer for precise calculations tailored to your project.


How much concret need for 250 sq ft?

1.5 meters


How much ballast required for 2 cubic metres of concrete?

To calculate the amount of ballast required for 2 cubic meters of concrete, you typically need to consider the concrete mix ratio. A common mix is 1 part cement, 2 parts sand, and 4 parts ballast. For 2 cubic meters of concrete, you would need approximately 1.5 cubic meters of ballast, assuming the total volume is made up of the components in that ratio. Adjustments may be necessary based on the specific mix design used.


How much does a David Brown 880 diesel tractor weigh?

Static weight with opperator -Rear 5430 lb with ballast 2950 lbs without ballast --------------------------------------Front 1810 lb with ballast 1540 lbs without ballast --------------------------------------Total 7240 lb with ballast 4470 lbs without ballast ----


Why does your electronic ballast hum?

Electronic ballast does not hum as much as a choke. Minute hum of electronic ballast is the small inductor and capacitor producing an oscillation for high voltage generation,


How much does it cost to install cement?

It cost as much as it costs to install cement. Ken It cost as much as it costs to install cement. Ken


How much cement fits in a cement truck?

About 8m^3


How much in jumbo bag of ballast?

A jumbo bag of ballast typically contains around 1 ton or 2000 pounds of material. This is equivalent to approximately 0.9 cubic meters or 31.5 cubic feet of ballast.


How much is a bag of cement in Zimbabwe?

Price of the bag of cement in zimbabwe