In Quebec, a cubic meter of concrete typically requires about 300 to 350 kilograms of cement, depending on the specific mix design and intended application. This is generally around 10-12% of the total volume of the concrete mix. The exact amount can vary based on factors like desired strength, workability, and the inclusion of additives or supplementary cementitious materials. Always consult local standards and guidelines for precise calculations.

User Avatar

AnswerBot

2w ago

What else can I help you with?

Related Questions

What is number of bags of cement required foe 1 cubic meter of M20 grade cement concrete?

M20 - 6.20bags


Cement quantity in m10 per cubic meter?

4.50/bag cement, required for 1 cubic metre of concrete ( M10).


How many cement bags per 1 cubic meter of concrete?

7 cement bags per 1 cubic meter of concrete......


What is the number of bags of cement required for 1 cubic meter of M15 grade cement concrete?

M 15 grade proportion - 1:2:4 (cement:FA:CA)Cement required in kgs - 325 kg per cu.mNo. of bags required - 6.50


How much sand and aggregate required 1 cubic meter of plain concrete cement?

For plain cement concrete, the aggregate used is of size 20 mm. For RCC structures, it is 40mm and for roads, it is 80mm


Mixture combination of 1 cubic meter concrete?

The mixture depends on the concrete strength, flow properties and other specifications required, quality of cement, aggregates and other chemical additives that will be used. Typically 1 cubic meter concrete should include about 310kg cement, 800kg sand, 900kg gravel and 220kg water.


What is the number of bags of cement required for 1 cubic meter of M25 grade cement?

For M25 grade concrete, the mix proportion is typically 1:1:2 (cement:sand:aggregate). This means for 1 cubic meter of concrete, you would need 1/4 cubic meter of cement. As 1 cubic meter is equivalent to 35.32 cubic feet, and one bag of cement usually covers around 0.035 cubic meters, you would need approximately 7-8 bags of cement for 1 cubic meter of M25 grade concrete.


How many 50kg cement bags is in 1 Cubic meter grade 30 concrete?

To determine how many 50 kg cement bags are required for 1 cubic meter of Grade 30 concrete, we need to break down the mix ratio and calculate the cement content based on that. Grade 30 Concrete Mix Ratio Grade 30 concrete typically has a mix ratio of 1:2:3 (Cement: Sand: Aggregate) by volume. This means: 1 part cement 2 parts sand 3 parts aggregate (gravel) However, the actual proportion of cement required can vary slightly depending on the specific mix design used by a contractor or engineer. For standard Grade 30 concrete, the cement content is typically around 350 to 400 kg per cubic meter. Since each cement bag weighs 50 kg, the number of bags required for 1 cubic meter of Grade 30 concrete would be: Number of bags = 350 kg / 50 kg   = 7 bags


How many cement bags required for 1 m3?

To calculate the number of cement bags required for 1 cubic meter (m³) of concrete, you typically need about 300 kg of cement for standard concrete mixes. Since a standard cement bag weighs 50 kg, you would require approximately 6 bags of cement to make 1 m³ of concrete. However, the exact amount may vary based on the specific mix design and project requirements.


What is density of one cubic meter of cement?

Daft question really! Should be what is the density of cement. Does the question mean cement ( dry powder), wet concrete, set concrete or what?


How much quantity of steel required for one cubic meter reinforced cement concrete?

It depends on the type of structure according to the load subjected


How many bags cement to make 1 cubic meter of M15 grade cement concrete?

15 milligrams