In programming a "pipe" usually refers to a connection to a data source (aka a database). The difference between a queue and a pipe is that a queue usually caches some data from the data source while a pipe is just a connection to the data source.
Ready queue contain all the jobs that are ready to execute.so the job queue and the ready queue are one and the same.
The queue is a linear data structure where operations of insertion and deletion are performed at separate ends also known as front and rear. Queue is a FIFO structure that is first in first out. Following are the types of queue: Linear queue Circular queue Priority queue Double ended queue ( or deque )
What is the difference between linear and circular queue? In: http://wiki.answers.com/Q/FAQ/2545-37 [Edit categories]The Queue by Default is Linear, it would be termed as Circular if the Last Element of the Queue pointsto the first element of the List
The queue is a linear data structure where operations of insertion and deletion are performed at separate ends also known as front and rear. Queue is a FIFO structure that is first in first out. A circular queue is similar to the normal queue with the difference that queue is circular queue ; that is pointer rear can point to beginning of the queue when it reaches at the end of the queue. Advantage of this type of queue is that empty location let due to deletion of elements using front pointer can again be filled using rear pointer.
Schedule 40 PVC is the type and thickness of water pipe.
Queue is for fixed length communication where as pipes are varaible lenght. Queue is for fixed length communication where as pipes are varaible lenght.
Rene Magritte meant that it is an image of a pipe .
it is meant to be seen by the audience
Corrugated Metal Pipe. CMP
Queue is a data structure which is based on FIFO that is first in first out. Following are the types of queue: Linear queue Circular queue Priority queue Double ended queue ( or deque )
Pipe schedule tell you something about the wall thickness of a pipe. Higher schedule means thicker wall. The actual thickness must be read from a pipe specification sheet, as it differs from material to material. Typical pipe sch. are Sch 20, 40, 80, 160, XS, XXS.
To speed up the program execution, the B.I.U fetches six instructions byte ahead of time from memory and stores in FIFO registers called "queue". Since EU and B.I.U are independent, the B.I.U fetches additional instruction, while EU decodes and executes a previously fetched instruction. When the execution unit is ready for its next instruction, it simply reads the instruction from the queue. The main point here is that, fetching of the next instruction is overlapped with the execution of current instruction. This is called pipe lining pipe lining saves time required for executing instructions. For example, if a multiplication operation is to be performed with its operands and registers, the microprocessor takes 100 clock-cycles, however, without pipe lining and with pipe lining, the number of clock cycles required to multiply two operands get relatively reduced. There are many instructions in 8086 microprocessor that require huge number of clock cycles. Thus, the prefetch queue becomes a circular part in enhancing the performance of the system.
Queues is the plural of queue.
circular queue
Ready queue contain all the jobs that are ready to execute.so the job queue and the ready queue are one and the same.
He added the download to the queue.(Line)I saw a queue in the park(waiting line)
Pipe schedule tell you something about the wall thickness of a pipe. Higher schedule means thicker wall. The actual thickness must be read from a pipe specification sheet, as it differs from material to material. Typical pipe sch. are Sch 20, 40, 80, 160, XS, XXS.