Welding on concrete is not advisable because the high temperatures involved can cause thermal shock, leading to cracking and damage to the concrete. Additionally, the sparks and molten metal produced during welding can create fire hazards and damage the surface. It's also challenging to maintain a stable and level work surface on concrete, which can compromise the quality of the weld. Instead, it's better to use metal surfaces or designated welding tables.

User Avatar

AnswerBot

6mo ago

What else can I help you with?

Trending Questions
How much work must you do to push a block of steel across a steel table at a steady speed of 1.30 ms for 4.70 s? Delay light in automatic voltage stabilizer come on? Major invention in 1880-1914? Materials that are sometimes classified as insulators and sometimes as conductors are called? What are the two main types of sewers and how do they differ? Bone fracture repair? Is oit possible to use three input in ic 7486? Why are you able to perceive certain electromagnetic fields? Write C program to find the sum of first 100 numbers? How do you write a c program to find a2 plus b2 plus 2ab? When 440 volts and 300 amps is given as an input to the transformer the output obtained is 11 kva in this secondary current will decrease or not? What are cookie cutters in computer programming? Advandage and disadvandage of berry transformer? When troubleshooting the problem scenarios during this lab which troubleshooting technique did you use primarily (top-down bottom-up or divide and conquer)? What type of copper is typically run underground? When do you get a default constructor When the class has no other constructors When you define at least one constructor When you define a class None of the above? Why inductor use in series capacitor in parallel? Write a program to find all triad numbers below 1000 where the second number is twice the first and the third is three times the first number? When petroleum the fractions rise up the tower? Can you fill a well If the water table is 30 metres down is it possible to fill the well shaft to the top?