answersLogoWhite

0

The thing you're talking about are two different things;for farmers, the AAA or Agriculture Adjustment Act helped them and the reactivating a hydroelectric power was the TVA or the Tennessee Valley Authority.

User Avatar

Wiki User

12y ago

What else can I help you with?

Related Questions

What is one example of a hydroelectric project in the Andes?

there is a project in the andeas where instead of turning the turbines using water they poo down these shoots and when the poo hits the turbines they move and create electricity


How does hydroelectric create electricity?

in your home it can create energy


Which town is create electricity to water first?

Appleton in Wisconsin was the first town in the world to create hydroelectric plant.


What was the James Bay Hydroelectric Project?

The James Bay Hydroelectric Project is a government hydroelectricity project that generates around 24,000 megawatts of electricity. It also takes up around 350,000km2 of Quebec's land. The building process consisted of three phases and only two of these three phases were completed. The third phase was put on hold and is still on hold till this day because of concerns on the ecological impact of the third phase of the project.


What Hydroelectric dams are developed to use moving surface water to create?

electricity


Hydroelectric dams are developed to use moving surface water to create?

electricity


What is a makefile project in c plus plus?

You use a makefile project when you have a project that you normally build from the command line. Your IDE will not recognise this project so you must create a makefile project for it. In Visual C++, for instance, you can use the Makefile Project Wizard to create a Makefile Project.


What project was put together to create the atomic bomb?

Manhattan Project


How do you create a plan out of computer project in which website designing is to be shown?

sir tell me how to create a plan out of the computer project where i have to give the plan out of my own website how will i create it


How long did it take to build th mica dam?

The Mica Dam, located on the Columbia River in British Columbia, Canada, was constructed between 1973 and 1979. The project took approximately six years to complete and involved significant engineering efforts to create a concrete gravity dam and hydroelectric power station. The dam is now a key component of the region's hydroelectric power generation system.


What kind of electricity do dams create?

hydroelectric power They produce what is called 3-phase AC power.


Does hydroelectric energy create polution?

No, apart from the destruction of environment/habitat caused by the dams and reservoirs required.