The Pamban Bridge, also known as the Pamban Rail Bridge, was primarily constructed using steel and concrete. The steel was utilized for the bridge's girders and other structural components to ensure strength and durability, while concrete was used for the foundations and piers. The combination of these materials allows the bridge to withstand harsh marine conditions, given its location over the Palk Strait in India.
Shanker Cement
The material used to build the bridge was wood and steel
Of prostitutes
Stone and steel.
cheese plastacine and gelatine
Reinforced concrete
The present London Bridge is a pre-stressed concrete box girder bridge.
Bricks concrete and steel.
The present London Bridge is a pre-stressed concrete box girder bridge.
plastic and metal C:
k;kmk;.k
it was made of simple macines and pullies