answersLogoWhite

0


Want this question answered?

Be notified when an answer is posted

Add your answer:

Earn +20 pts
Q: Based on information from the initial capabilities document (icd) an aoa includes?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the name of the document that is prepared by the user to document a need that requires a materiel solution?

The Initial Capabilities Document (ICD) is prepared by the user to document a need that requires a materiel solution.


A description of gaps in capability for a particular functional or mission area is called?

Initial Capabilities Document (ICD)


What describes gaps in capability for a particular functional area in accordance with the CJCSI 3170.01G?

Initial Capabilities Document


What identifies the advantages and disadvantages of one or more potential solutions to meet the need described in the Initial Capabilities Document?

Analysis Of Alternatives


The purpose of the Materiel Solution Analysis phase is to?

Conduct an AoA to analyze alternative material solutions, that meet the user's needs identified in the initial capabilities document.


Which set was developed to supplement the capabilities of the initial flightline set?

follow-on set


What is the initial cost of geothermal heating for residential?

The initial cost would be buying the land that has geothermal capabilities as most land does not, so hundreds of thousands.


The prime source of testable parameters for operational test and evaluation is the?

Per Lesson 18 of DAU ACQ101Capability Development Document (CDD)The CDD is a formatted document that provides operational performance parameters necessary to design a proposed system. The CDD builds on the Initial Capabilities Document (ICD) and must be approved prior to Milestone B.The CDD documents the user's operational performance capabilities in terms of thresholds (minimum acceptable value) and objectives. It also provides system-specific requirements such as:l Rangel Speed of data transmissionl Reliability


What is project charter in project management?

The project charter is a document that states the initial requirements to satisfy the stakeholders needs and expectations. It is the document that formally authorizes the project. The project charter is the document that formally authorizes a project, which includes naming the project manager and determining the authority level of the project manager.


What does Drafting means in writing form?

Drafting - is preparing an initial copy of a document.


If you have a legal document that is signed and you scratch something out. Is this a form of altering?

If the "scratch" was made after the document was signed, and was made without the knowledge and consent of any other party having an interest in it, or if the "scratch" substantially changes the information in the document, then yes, that is a form of altering. This can be a criminal offense, depending on the nature of the document, the change that was made, and the reason for making it. The usual procedure for making changes in a document is to draw a single line through the text to be removed (so that it can still be read), enter the changed or correct information adjacent to the original, and have all signatories to the document initial the change.


What is preliminary investigation report?

A preliminary investigation report is a document that provides an initial assessment of a situation or incident. It outlines the facts, evidence, and initial findings gathered during the early stages of an investigation. This report helps to guide further investigation efforts and decision-making.