drill holes and insert a concrete lag that follows layout for the door and then attach to the door casing.

User Avatar

Wiki User

14y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Explain how the feet of door frames with out a cill are secured to the concrete over site or screed?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Engineering

What is the mix for concrete for an outdoor pizza oven?

Vitcas Heatproof Screed is suitable for outdoor oven a


What does a Screed Operator do?

A paving machine typically has a crew of three... the paver operator, who drives the paver, and the screed operators. The screed is what spreads and levels the asphalt, and the operators adjust the screed plates to ensure that the roadway is laid smooth, is the right thickness, and is adjusted for the road crown when applicable.


How do you remove tile from a concrete floor?

If these are ceramic ect; and they are solid ;leave alone. Depending on what you are going to replace them with;you could screed over joints ect with floor compound . If you have to lift them you could use a chisel or hire a small power tool with a chisel point.;but even then you could be left with rough floor and still have to screed. I your going to lay a vinly you might cover with ply this you would have to be fixed with rawlplugs/screws.


What is vacuum dewatered flooring?

Process In this system, concrete is poured in place & vibrated with a poker vibrator. Then a screed vibrator is run over the surface, supported on channel shuttering spaced 4.0 meters apart. The screed vibrator is run twice to achieve optimum compaction & leveling. After this a system of lower mats & top mat is laid on the green concrete & this is attached to a vacuum pump. This draws out excess water.Benefits 1. Compressive strength of floor increases by upto 60% 2. Tensile strength increases by @ 70% 3. Cement consumption is reduced to the extent of 40%, no cement is required separately for finishing the surface. 4. Abrasion resistance of the floor increases by @ 60% resulting in les wear and rear of the floor surface 5. Shrinkage of concrete is reduced and floor wraps less.


How do you calculate floor mass of concrete screed floor?

The bulk density of screed is 22KN/m³. Simply multiply by the thickness to get a weight. 22kN/m³ = 22000N/m³ 1 Newton = Mass x Acceleration = kg * g (g is acceleration due to gravity) On earth g is 9.8 22000N/m³ = 2245kg/m³ You then multiply this by the thickness to get the surface mass. Say it is 50mm 2245kg/m³ x 0.005m = 112.25kg/m² You then multiply this by the area of the floor to get the total floor weight. If you have 100m² floor area then 112.25kg/m² x 100m² = 11225kg

Related questions

What is the mortar layer on concrete floor for smooth finish?

screed


What is Screed primarily used for?

Screed is primarily used to smooth concrete after it has been placed on a surface, it is a flat board. It is an essential factor in placing down flooring.


Choose an item that is not an advantage of using a mechanical screed?

allows the use of higher slump of concrete which results in stringer concrete


What is the mix for concrete for an outdoor pizza oven?

Vitcas Heatproof Screed is suitable for outdoor oven a


What is a word associated with concrete?

Cement, aggregate, slump, set, float, screed, finish, pour, broom, form.


What does a Screed Operator do?

A paving machine typically has a crew of three... the paver operator, who drives the paver, and the screed operators. The screed is what spreads and levels the asphalt, and the operators adjust the screed plates to ensure that the roadway is laid smooth, is the right thickness, and is adjusted for the road crown when applicable.


How do you put sub floor down on concrete for a ceramic tile floor?

I would use a latex screed. like cement but with a latex binder, add water pour 5- 10mm on to the concrete and it self levels.Dries in about a day.Put a poylthene membrane down first if damp is a problem


What is the function of the floor screed?

The function of floor screed is to make a structural level floor surface above a waterproof membrane. It is usually made by either pumping in a special mix of self- levelling runny 'concrete - like' material or more traditionally a sharp sand and cement mix. Traditional screed is tamped by a large flat wooden or aluminum beam, which is called a screed, from which screed gets it's name. It should be very flat once finished and can be tiled once it has dried out, which can take weeks. It is usually laid over an insulation foam and often has electric heating elements or warm water pipes in it to make it into a large radiator. Thin screed needs to be reinforced to make it strong enough for the loads that are put on top of it which can be steel mesh or special fibres. This means that thinner screeds are often made up of specialist ingredients to make them self levelling and strong.


What is grano screed?

Grano Screed is a type of flooring. The flooring is a tile-type of flooring. You need to use cement to put the flooring down.


What is a long effusion spoken or written?

Screed


How do you remove tile from a concrete floor?

If these are ceramic ect; and they are solid ;leave alone. Depending on what you are going to replace them with;you could screed over joints ect with floor compound . If you have to lift them you could use a chisel or hire a small power tool with a chisel point.;but even then you could be left with rough floor and still have to screed. I your going to lay a vinly you might cover with ply this you would have to be fixed with rawlplugs/screws.


What is the function of the floor?

The function of floor screed is to make a structural level floor surface above a waterproof membrane. It is usually made by either pumping in a special mix of self- levelling runny 'concrete - like' material or more traditionally a sharp sand and cement mix. Traditional screed is tamped by a large flat wooden or aluminum beam, which is called a screed, from which screed gets it's name. It should be very flat once finished and can be tiled once it has dried out, which can take weeks. It is usually laid over an insulation foam and often has electric heating elements or warm water pipes in it to make it into a large radiator. Thin screed needs to be reinforced to make it strong enough for the loads that are put on top of it which can be steel mesh or special fibres. This means that thinner screeds are often made up of specialist ingredients to make them self levelling and strong.