Want this question answered?
by drawing an egg shaped cactus
Documents like safety handouts, drawings, planning documents, work instructions, maintenance records, and technical manuals are typically obtained from a variety of sources including your employer, relevant regulatory agencies, equipment suppliers, and internal company databases. They can also be provided during training sessions, project kick-off meetings, or through online platforms specific to your industry. It's important to ensure that you have the most up-to-date versions of these documents to work effectively and safely.
Vvvv
Clip art
SD-Schematic Design(or Drawings)-usually around 25% complete, DD-Design and Development (or Design Drawings)-around 50% complete & CD-Construction Drawings or Contract Drawings (or documents)-usually 100% complete
I feel the best way to to ask sito or ohone a friend
always have back up of the document you silly badgers!
The drawings and documentation are delivered to the tool room once they are finished. To ensure the documents are correct these have to be stamped, dated and signed by the creator of the documentation.
Vvvv
Textual studies drawings typically refer to detailed illustrations or diagrams used in the field of textual studies to visually represent concepts related to written texts, such as manuscripts, books, or other forms of writing. These drawings can help scholars analyze and interpret the physical characteristics of texts, such as layout, structure, and material features.
so no one colours them in or draws funny faces or make like cartoons out of the drawings so that winnie the poo cant tell them off... if you think about it, you ave got to be like level 0.5 in engineering to be as stupid as to make tools.
The role of an engineering drawing office is to create detailed working drawings that will be presented for the project. These engineers may also able to interpret their works.