Q: How does a sub contractor in Nevada get paid by general contractor?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Is a person a subcontractor if the general contractor makes the price?

Anyone who does work for a general contractor and is not a direct employee of that contractor is a sub-contractor. Regardless of who sets the price. The subcontractors work within the contract set between the general contractor and homeowner. Hence sub-contractor.


What is sub-tier contractor?

A General Contractor hires Sub Contractors to do different portions of the toal project. A Sub Contractor may then hire a Sub Tier Subcontractor to do a portion of their work.


What is tier contractor?

A General Contractor hires Sub Contractors to do different portions of the toal project. A Sub Contractor may then hire a Sub Tier Subcontractor to do a portion of their work.


Can a subcontractor put a lien on the clients home?

Yes. You should have requested a release signed by each sub before you paid the builder. It's a system that sucks, but as a sub it's the only thing we can do to get paid.


What is the maximum allowable percentage of total pay to sub-contractors before being considered a general contractor by liabiltiy insurance providers?

Most of the time it is 25% or more then you become a general contractor.


What insurance obligations contractor have if subcontractor has no insurance and caused the loss?

The primary contractor is going to have to cover the loss since the uninsured sub was working for them. It is the General contractors responsibility to make sure his sub-contractors were properly insured.


What are the Factors involve in pricing general and special attendance on sub contractor in tendering and estimating?

Discuss factors in pricing general and special attendance on subcontractors?


Is a general contractor on a cost plus basis required to supply invoices from sub contractorsand vendors?

Yes. You should be set up to be paid at several intervals based on what the job costs are. You need to show back up to get your pay.


What is the difference between a prime contractor and a subcontractor?

The prime contractor is contracted by the end customer. Sub-contractors are contracted by the prime contractor or other sub-contractors.


What is the difference between a general engineering contractor and a general building contractor?

A general engineering contractor is a contractor whose principal contracting business is in connection with fixed works requiring specialized engineering knowledge and skill, including irrigation, drainage, water power, water supply, flood control, inland waterways, harbors, docks and wharves, shipyards, roadways, airports, bridges, etc. A general building contractor simply builds buildings.


Who is responsible for pricing extras on a home building the builder or the sub contractor?

The contractor will get a bid from the sub contractor and add his percentage, then present the change order to the customer. This depends on the change. Some changes are items which are pre-set arrangements between the contractor and sub that can be priced without a bid from the sub. Flooring for example.


Can a contractor hire a sub-contractor without the permission of the owner hiring the contractor?

That will depend on the contract. Some contracts allow it, others require notification and approval of sub-contractors.