Damage floor screeding can be topped up by applying a well blended mixture of Cement with graded aggregates and water to the floor base.
i have recently learnt abit about laying granolithic floors basicaly what you have to do is lay it same as a normal screed then when the water comes to the top you have to go over it till its gone then wait until water comes back up and keep repeating this process until no more water comes back up
Do you mean the base board? It is better if you can remove the base board then reattach on top of the new floor. It will give you the best look. If you butt the new wood up against the base boards you may have end cuts or little mistakes around the edges of the room that you will need to cover anyway. If you can not remove the base board you will probably have to add a strip of quarter round on top of the new floor and nailed to the original base board so that you have a finished look.
You will have to restate your question. What do you mean by 'top up'?
Actually walking up the stairs is faster
If you have a drain available. You may need to chip some concrete around the drain to install the bottom half of the drain. With that in place, set the shower over it and the top piece screws into the drain to form a seal. You can build a 2x4 frame and raise the shower up enough to run a drain to a sump or a floor drain.
This depends on the type of floor. If lino flooring it should be taken up and replaced, but tiles can be difficult to remove. Tiles can have screed over them and a new floor placed over the top.
The function of floor screed is to make a structural level floor surface above a waterproof membrane. It is usually made by either pumping in a special mix of self- levelling runny 'concrete - like' material or more traditionally a sharp sand and cement mix. Traditional screed is tamped by a large flat wooden or aluminum beam, which is called a screed, from which screed gets it's name. It should be very flat once finished and can be tiled once it has dried out, which can take weeks. It is usually laid over an insulation foam and often has electric heating elements or warm water pipes in it to make it into a large radiator. Thin screed needs to be reinforced to make it strong enough for the loads that are put on top of it which can be steel mesh or special fibres. This means that thinner screeds are often made up of specialist ingredients to make them self levelling and strong.
The function of floor screed is to make a structural level floor surface above a waterproof membrane. It is usually made by either pumping in a special mix of self- levelling runny 'concrete - like' material or more traditionally a sharp sand and cement mix. Traditional screed is tamped by a large flat wooden or aluminum beam, which is called a screed, from which screed gets it's name. It should be very flat once finished and can be tiled once it has dried out, which can take weeks. It is usually laid over an insulation foam and often has electric heating elements or warm water pipes in it to make it into a large radiator. Thin screed needs to be reinforced to make it strong enough for the loads that are put on top of it which can be steel mesh or special fibres. This means that thinner screeds are often made up of specialist ingredients to make them self levelling and strong.
i have recently learnt abit about laying granolithic floors basicaly what you have to do is lay it same as a normal screed then when the water comes to the top you have to go over it till its gone then wait until water comes back up and keep repeating this process until no more water comes back up
Yes it will damage a rubber floor mat in time if not cleaned up soon.
It is possible to use either the lift or the stairs to get to the second floor, but from there up to the third floor you have to use the lift .
Go up the stairs.
down
Train on the Demon at the Wizard's Tower, top floor.
Go to the museum. Go right and there is a robot thing. Pull the lever on the top of the robot to move the arms. go up to the top floor. after you reach the top floor, go to the right and there it is.
A cheat is to use the move DIG on the second floor, and you will end up on the top.
Yes, Emily shut up the top floor of her house after the death of her father. She did not allow anyone to enter that part of the house until her own death.