Want this question answered?
The Pontiac silverdome stadium in December 1975
C. Don Davidson was the designer of the Pontiac Silverdome. The Silverdome was home of the Detroit Lions until Ford Field was built and the team was relocated back to Detroit.
The Pontiac Silverdome cost $55.7 million to build in 1975. In 2009 the Silverdome was sold to a Canadian buyer for $583,000. The stadium costs are $1.5 million a year to maintain.
Pontiac Silverdome
The Pontiac Silverdome is a stadium in Pontiac,Michigan, not a car.The people of the city spent 55 million dollars building it and then sold it for only 583,000 dollars.
To find the Pontiac Silverdome, you can look their number up in the phone book and call them, or go online and find them through mapquest or yellow pages.
Pontiac Silverdome
The Dimensions of the Silverdome are as follows:Height: 61.6 metersCoverage Area: 39,945 square meters61.6 meters x 39,945 square meters = 2,460,612 cubic meters2,460,612 cubic meters = 3,218,358.99 cubic yardsTherefore, the volume of the Pontiac Silverdome is equal to:3,218,358.99 cubic yards
The Silverdome is located in the USA in the state of Michigan. The full address is 1200 Featherstone Road, Pontiac, Michigan, 48342, United States. It has a capacity of 82,000.
Prior to moving to the Silverdome for the 1978-79 season, the Pistons played in Cobo Arena from 1961-62 through 1977-78.
The Pontiac Silverdome in Detroit. http://en.wikipedia.org/wiki/Pontiac_Silverdome
The Pontiac Silverdome had a capacity of around 80,300 people for football games and concerts. However, due to renovations and changes in seating configurations, the capacity could vary for different events.