answersLogoWhite
BMW 3-Series
Pontiac Trans Am
Nissan 200SX

Where would you find pinouts for a production date September 1985 Nissan 200sx Ca20E 2.0L manual trans efi control module and its components wiring connections?


Top Answer
User Avatar
Wiki User
2006-12-28 23:45:47
2006-12-28 23:45:47

its located behind the drivers side headlamp, in engine compartement but if you need more info you can email me at d420johnson@yahoo.com

Related Questions

User Avatar

A control framework in which the connections between the information and yield signs are generously straight in spite of the presence of nonlinear components.

User Avatar

Production planning is the projected flow of production , while production control is the systematic approach to control the flow of projected production.

User Avatar

The Production Budget for Control was $6,400,000.

User Avatar

Daniel Sipper has written: 'Production' -- subject(s): Inventory control, Production planning, Production control 'Production: Planning, Control and Integration'


Copyright © 2020 Multiply Media, LLC. All Rights Reserved. The material on this site can not be reproduced, distributed, transmitted, cached or otherwise used, except with prior written permission of Multiply.