It differs everywhere you go. You have have to find out the prevailing rate for your competence and your area.
The flat rate time on that job is about 2 hours, depending on where you are the rate of a labor hour will vary. It will be more if you go to dealer than an independent garage and Volvo parts are very expensive. The fuel pump can be 100 something and if they sell you an entire sending unit that may double or triple the cost of parts then add the 2 hours of labor to get an approximate idea of the cost of repair.
There may be no specific flat rate time for a repair like that, the cost will vary depending on the labor rate and how much time the technician takes to perform repair.
That depends on the labor rate where you are; it ranges from 1.6hrs with a V8, 1.9hrs with a V6 w/o air, or 2.2hrs with a V6 w/air.
The normal sedimentation rate (Westergren method) for males is 0-15 millimeters per hour, and for females is 0-20 millimeters per hour. The sedimentation rate can be slightly more elevated in the elderly and is much lower for children.
Direct labor hour rate is the per hour wage rate paid to skilled or unskilled labor to make one unit of product.
15 dollars an hour for labor is a fair rate
it isn't a flat rate deal. It is labor intensive and is billed by the hour.
Most repair shops charge 1 hour labor to plug in and check. Your local labor rate will vary.
Weaver Company's predetermined overhead rate is $18.00 per direct labor-hour and its direct labor wage rate is $12.00 per hour.
The money wage rate is the number of dollars that an hour of labor earns.
Six hours of labor to replace your 1998 Chevrolet Cavalier clutch. The cost will be determined by the labor rate. $75 an hour for labor will cost $450.
As of May, 2014 the average Mechanical Labor rate is $110 per hour. Body Labor is $85 per hour. Frame and Glass Labor is $98 per hour. These rates are averages based on my experience (I am in the industry). Insurance companies typically don't pay these rates, although they should.
$41.79 per hour is the average labor rate for a exterior painter in AZ Per hr.
The rear wheel ball bearing is $86 and you are looking at 1 hour of labor at whatever labor rate is by who is doing the work.
A machine hour rate is the cost of one machine working for one hour. This is used in calculating overhead costs to work in process as opposed to using labor hours.
I'm a mechanic, And have my own buisness . I charge 350.00 for parts and labor. But my labor rate is only 50.00 a hour, And parts are about 50.00