7 bags per 1000 on mortar mix and half a truckload of "mortar" sand aught to do it.
for preparing cement mortar C.M.(1:6) number of cement bags required are nearly 5.14 bags.calculation: for preparing 1 cu.m wet C.M(1:6), dry material required is 25% extra.therefore dry material required is 1.25 cu.mhence cement required=1.25/(1+6)=0.178 cu.m(sand required=0.178*6=1.068 cu.m)density of cement=1440 kg/cu.m=>cement required in kg=0.178*1440=256.32cu.mwt. of cement in kg per bag=50kgtherefore no. of bags required is=26.32/50=5.14bags.thank u.
depends on bad size and product, the calculations for what you are asking are on the bags back and product websites
how many bags of cement for a pad 4x7x4 inches thick
20
4.4 Bags
0.1865 bag
M 15 grade proportion - 1:2:4 (cement:FA:CA)Cement required in kgs - 325 kg per cu.mNo. of bags required - 6.50
it depends on the type of mix and water cement ratio.
for preparing cement mortar C.M.(1:6) number of cement bags required are nearly 5.14 bags.calculation: for preparing 1 cu.m wet C.M(1:6), dry material required is 25% extra.therefore dry material required is 1.25 cu.mhence cement required=1.25/(1+6)=0.178 cu.m(sand required=0.178*6=1.068 cu.m)density of cement=1440 kg/cu.m=>cement required in kg=0.178*1440=256.32cu.mwt. of cement in kg per bag=50kgtherefore no. of bags required is=26.32/50=5.14bags.thank u.
3
The answer will depend on the size of the cement bags! The answer will depend on the size of the cement bags! The answer will depend on the size of the cement bags! The answer will depend on the size of the cement bags!
M 15 grade - 1:2:4Cement bags required - 6.5 bagsCement required - 325 kgs
M20 - 6.20bags
35kg
1 bag
To calculate the number of cement bags required for 1 cubic meter (m³) of concrete, you typically need about 300 kg of cement for standard concrete mixes. Since a standard cement bag weighs 50 kg, you would require approximately 6 bags of cement to make 1 m³ of concrete. However, the exact amount may vary based on the specific mix design and project requirements.
7 bags cement