To determine the amount of concrete needed for a 30 x 12 area, you first need to calculate the area, which is 30 feet multiplied by 12 feet, resulting in 360 square feet. If you're pouring a standard thickness of 4 inches (0.33 feet), you would multiply the area by the thickness: 360 square feet x 0.33 feet = 118.8 cubic feet. To convert cubic feet to cubic yards (since concrete is typically sold by the cubic yard), divide by 27, resulting in approximately 4.4 cubic yards of concrete required.
A cubic foot of concrete weighs ABOUT 150 pounds. 4 feet by 12 feet by 4 feet is 192 cubic feet. If you meant 4 feet by 12 feet by 4 INCHES, that would be 16 cubic feet.
To determine area (square footage) multiply length times width- in this case, multiply 12 x 12.
385
a 12 x 12 tile is 1 square foot. So, you would need 300 tiles to cover 300 square feet
13.38 m2
no .of bricks = area of room /area of bricks area of room = 9 X12 X12 X12 inches ( 1 foot =12 inches ) area of bricks =3 X8 no.0f bricks =9 X12 X12 X12 inches /3 X 8 =648
no .of tiles = area of room /area of tiles area of room = 9 X12 X12 X12 inches ( 1 foot =12 inches ) area of tiles =3 X8 no.0f tiles =9 X12 X12 X12 inches /3 X 8 =648
399
The ones that I see are 2-3/8" thick and 6"x12" in size.
A cubic foot of concrete weighs ABOUT 150 pounds. 4 feet by 12 feet by 4 feet is 192 cubic feet. If you meant 4 feet by 12 feet by 4 INCHES, that would be 16 cubic feet.
If you mean 14 times 12 then it is 168
If tile is 12'x12' then their is 36
12 x12 = 144
None. A hole has NOTHING in it!
A square foot is measured 12''x12'' x12''x12'', or a 12'' square.
Crushed concrete is sold by the ton. One dumptruck will haul between 13 and 15 tons. Your driveway should take around 30 tons if covered 4" thick.
The price of normal monthly Runescape membership for your country x12.