There are numerous ways to enhance track capacity. The simplest being to run longer train consists. Next, more tracks could be built within the existing Right of Way. Alternative, curves and elevation chances can be flattened out to provide higher operating speeds.

User Avatar

Wiki User

15y ago

What else can I help you with?

Continue Learning about Civil Engineering

Why is a transition curve required in a railway track?

Not being an engineer but having worked at a narrow-gauge and diesel railway theme park, I know that it was because of the mountain curves that narrow-gauge rails were used in logging to accommodate them because the larger gauge rails could not; "transition curve" sounds like it's a very gradual turn that ever narrows into the required tighter radius.


Allowable bearing capacity?

what the bearing capacity for weather rock


What is the link between CBR and bearing capacity if you get figures in CBR how can you link them to the bearing capacity in kPa?

The link between CBR and bearing capacity if you get figures in CBR how can you link them to the bearing capacity in kPa, this is the link in soil testing.


What is allowable structural capacity of pile in pile load test?

allowable structural capacity


Role of engineers in nation building?

HUBLI: If every engineer works with a vision, the country can grow by leaps and bounds, said Trilok Nath Perti, General Manager of the South Western Railway. Inaugurating a seminar on "Role of railway engineers in nation building," organised by the Institution of Permanent Way Engineers (IPWE), as part of Engineers' Day celebration here on Friday, Mr. Perti said that Sir M. Visvesvaraya as one such engineer with a vision. He said that Indian engineers have done wonders in the field of technology and have a major role to play in the development of the nation. Railway engineers have contributed a lot in nation building, he said. "Innovations are bound to come. Laying six lanes with 60 tonne capacity road vehicles, energy through edible oil and similar innovations may materialise in the days to come. Engineers have to have an imagination and should work in that direction till the goal is achieved," he said. N.V.P.S. Rao, former General Manager, Wheel and Axle Plant, underscored the need for increasing more intercity express trains, by which, he said that the railways could meet 50 to 60 per cent transport needs of the country. K.J.S. Naidu, Chief Engineer (coordination), SWR, spoke on the contribution made by Sir M.Visvesvaraya. "Sir M.V. was a statesman, good administrator, principled man and meticulous planner", he said. S.C. Sood, Chief Mechanical Engineer (Planning), P.S. Bajwa, Chief Electrical Engineer, S. Manohar, Chief Signal and Electrical Engineer, Arun Bagra, Chief Personnel Officer, Harijeevan Alva, Controller of Stores, spoke on the occasion. S. Balakrishna, Chief Track Engineer, welcomed the gathering. Vipin Kumar, Deputy Chief Engineer (Track) coordinated the seminar and B.P. Sundarrajan, Executive Engineer (Track Supply) proposed a vote of thanks.

Related Questions

Advantages of standard gauge railway track?

The standard gauge railway line allows for increased capacity for standard gauge railway line through the addition of an extra track on the current line.


What is the Luhya translation of railway track?

The Luhya translation of the English words 'railway track' is "Irelwee".


What is the difference between in Normal speed railway track or High speed railway track are the rails of High speed railway track thick than Normal speed railway track?

Its not necessarily heavier (thicker is the wrong term), but it is more carefully aligned - and the curves are gentler.


What is the basic salary for track man in railway?

railway minister


What is a completed railway track called?

A completed railway track is called... wait for it... a "Railway track"! The word "Network" could also be applied here when referring to an entire infrastructure of railways. Railway LINE and RailROAD are also common terms. When talking about modelrailways, a completed system of track could be called a "Layout", "Track-plan" or "System".


Which is the longest railway track in Pakistan?

The biggest railway platform in Pakistan is ROOHRI, located in Sindh! Hope this helped a little


What has the author Gerald Jacobs written?

Gerald Jacobs has written: 'Midlands and North West (Railway Track Diagrams)' 'Railway Track Diagrams'


Who invented the railway track?

An English dude.


What is the maximum inclination of railway track?

10°


How many meters wide is broad gauge railway track?

Broad gauge railway track is appproximately 5-foot 6 meters wide


How do railway engineers make sure that railway tracks are parallel?

In Great Britian, when track is being laided, there is a track machine used to "tamper" the track so they are straight and parallel to each other.


Why are solids used for railway lines?

They are used so that the railway track doesn't compress or move, and stay's the same so the train doesn't squash the track.