Not being an engineer but having worked at a narrow-gauge and diesel railway theme park, I know that it was because of the mountain curves that narrow-gauge rails were used in logging to accommodate them because the larger gauge rails could not; "transition curve" sounds like it's a very gradual turn that ever narrows into the required tighter radius.

User Avatar

Wiki User

17y ago

What else can I help you with?

Continue Learning about Civil Engineering

What is a transistion curve?

There are many different types of transition curves but...'Transition Curve', a simple tool used to understand the sorts of issues people might be facing during changeA track transition curve, transition spiral, or spiral easement, is a mathematically calculated Euler spiral fitted between a straight (also known as tangent) and a circular curve on a section of rail track or highway.Website-- http://en.wikipedia.org/wiki/Track_transition_curve--Sillypinkjade------


How railway track capacity can be enhanced?

There are numerous ways to enhance track capacity. The simplest being to run longer train consists. Next, more tracks could be built within the existing Right of Way. Alternative, curves and elevation chances can be flattened out to provide higher operating speeds.


Role of engineers in nation building?

HUBLI: If every engineer works with a vision, the country can grow by leaps and bounds, said Trilok Nath Perti, General Manager of the South Western Railway. Inaugurating a seminar on "Role of railway engineers in nation building," organised by the Institution of Permanent Way Engineers (IPWE), as part of Engineers' Day celebration here on Friday, Mr. Perti said that Sir M. Visvesvaraya as one such engineer with a vision. He said that Indian engineers have done wonders in the field of technology and have a major role to play in the development of the nation. Railway engineers have contributed a lot in nation building, he said. "Innovations are bound to come. Laying six lanes with 60 tonne capacity road vehicles, energy through edible oil and similar innovations may materialise in the days to come. Engineers have to have an imagination and should work in that direction till the goal is achieved," he said. N.V.P.S. Rao, former General Manager, Wheel and Axle Plant, underscored the need for increasing more intercity express trains, by which, he said that the railways could meet 50 to 60 per cent transport needs of the country. K.J.S. Naidu, Chief Engineer (coordination), SWR, spoke on the contribution made by Sir M.Visvesvaraya. "Sir M.V. was a statesman, good administrator, principled man and meticulous planner", he said. S.C. Sood, Chief Mechanical Engineer (Planning), P.S. Bajwa, Chief Electrical Engineer, S. Manohar, Chief Signal and Electrical Engineer, Arun Bagra, Chief Personnel Officer, Harijeevan Alva, Controller of Stores, spoke on the occasion. S. Balakrishna, Chief Track Engineer, welcomed the gathering. Vipin Kumar, Deputy Chief Engineer (Track) coordinated the seminar and B.P. Sundarrajan, Executive Engineer (Track Supply) proposed a vote of thanks.


How do you write letter to contractor for early completion of work?

The Project Manager Name of Firm Address Subject: Name of Project Sir: This is in connection with your contract for (Project Name) Upon inspection of the above-named project, we found out that your accomplishment to date is way behind the schedule. Please be reminded that the project completion is on (date). To finish the project on time we are recommending that you fast track your work by adding manpower and follow the schedule as reflected on your submitted construction schedule and S-Curve. Please be guided accordingly. Very truly yours, Name of designated officer Position


What is a qabiil?

Qabiil is a way for us to track our lineage and kinship.Is part of our culture and identity.Allah has created Qabiil in order for for us to get to know one another

Related Questions

What is a transistion curve?

There are many different types of transition curves but...'Transition Curve', a simple tool used to understand the sorts of issues people might be facing during changeA track transition curve, transition spiral, or spiral easement, is a mathematically calculated Euler spiral fitted between a straight (also known as tangent) and a circular curve on a section of rail track or highway.Website-- http://en.wikipedia.org/wiki/Track_transition_curve--Sillypinkjade------


What is the Luhya translation of railway track?

The Luhya translation of the English words 'railway track' is "Irelwee".


What is the difference between in Normal speed railway track or High speed railway track are the rails of High speed railway track thick than Normal speed railway track?

Its not necessarily heavier (thicker is the wrong term), but it is more carefully aligned - and the curves are gentler.


What is the basic salary for track man in railway?

railway minister


What is a completed railway track called?

A completed railway track is called... wait for it... a "Railway track"! The word "Network" could also be applied here when referring to an entire infrastructure of railways. Railway LINE and RailROAD are also common terms. When talking about modelrailways, a completed system of track could be called a "Layout", "Track-plan" or "System".


Which is the longest railway track in Pakistan?

The biggest railway platform in Pakistan is ROOHRI, located in Sindh! Hope this helped a little


What has the author Gerald Jacobs written?

Gerald Jacobs has written: 'Midlands and North West (Railway Track Diagrams)' 'Railway Track Diagrams'


How does running track relate to geometry?

For anything beyond 100 metres, a running track will need to go around a curve. The measurement of the track length along the curve requires knowledge of geometry.


Advantages of standard gauge railway track?

The standard gauge railway line allows for increased capacity for standard gauge railway line through the addition of an extra track on the current line.


Who invented the railway track?

An English dude.


What is the maximum inclination of railway track?

10°


How many meters wide is broad gauge railway track?

Broad gauge railway track is appproximately 5-foot 6 meters wide